You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: PWG127-SOLID-6580
Header Information
Bid Number:
PWG127-SOLID-6580
Description:
Unit 2 Phase 5-2 Liner Construction Project at the San Timoteo Sanitary Landfill
Bid Opening Date:
11/12/2026 10:00:59 AM
Purchaser:
Michael Reyna
Organization:
Public Works
Department:
SOLIDWASTE - Public Works - Solid Waste
Location:
SWENG - Engineering
Fiscal Year:
27
Type Code:
RB - Request For Bid
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
10/27/2026 12:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
A mandatory Pre-Bid Meeting will be held at 10:00AM on November 4, 2026, at the Department of Public Works, Solid Waste Management Division, 222 W. Hospitality Lane, 2nd Floor, San Bernardino, CA 92415-0017 in Conference Room A.
Bulletin Desc:
A mandatory job walk will follow the pre-bid meeting at the San Timoteo Sanitary Landfill, 31 Refuse Road, Redlands, CA 92373. Please bring proper Personal Protection Equipment consisting of safety vest, hard hat, and working boots.
Ship-to Address:
Solid Waste Operations Superintendent
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415-0017
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 386-8756
Bill-to Address:
Billing Address
Fiscal Staff
825 East Third Street, Room 201
San Bernardino, CA 92415-0835
US
Email: billpay@dpw.sbcounty.gov
Phone: (909) 387-8137
Print Format:
File Attachments:
Exhibit A PREVAILING WAGE REQUIREMENT 2025
Prevailing Wage Determinations 9-2025
STSL Unit 2 Phase 5-2 Liner Construction Project
STSL Unit 2 Phase 5-2 Liner Construction Project
STSL Unit 2 Phase 5-2 Liner Construction Project
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
Item Information
Item # 1: ( 665 - 44 )
This project involves the construction of Unit 2 Phase 5-2 Liner at the San Timoteo Sanitary Landfill in Redlands, California. The scope of work includes grading, excavation, unclassified fill and stockpiling, installation of a composite liner system and leachate collection and removal system, construction of miscellaneous civil and drainage improvements, installation of landfill gas infrastructure, stormwater management and compliance, and road/fence improvements.
NIGP Code:
665-44
Landfill Liners and Covers
Qty
Unit Cost
UOM
Total Discount Amt.
Tax Rate
Tax Amount
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Quote #
Description
Date Last Modified
Status