You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: SPD120-SPDAD-3744
Header Information
Bid Number:
SPD120-SPDAD-3744
Description:
CSA 59 Road Rehabilitation
Bid Opening Date:
05/14/2020 01:59:59 PM
Purchaser:
Bill Brock
Organization:
Special Districts
Department:
SPDADMIN - ADMINISTRATION
Location:
OPS - Operations
Fiscal Year:
20
Type Code:
RB - Request For Bid
Allow Electronic Quote:
No
Alternate Id:
30.30.0080
Required Date:
Available Date :
02/24/2020 03:04:00 PM
Info Contact:
Greg Bacon, Sr. Project Manager, (909) 386-8800
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Mandatory Pre-Bid Meeting is now scheduled for Wednesday, April 29, 2020 @ 10:00 a.m. at the intersection of Edgecliff Dr and Grass Valley Road in the Lake Arrowhead area where a job walk will follow.
Bulletin Desc:
Pulverize, grade shape compact and pave approximately 64,400 SF of existing road surfaces as indicated on plans and specs.
Ship-to Address:
Reception
Eng Tech
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415
US
Email: SDDprocurement@sdd.sbcounty.gov
Phone: (909)386-8800
Bill-to Address:
Special Districts Department
Fiscal Specialist
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415
US
Email: rosa.lopez@sdd.sbcounty.gov
Phone: (909)386-8800
Print Format:
File Attachments:
General Prevailing Wage Determinations
Exhibit A PREVAILING WAGE REQUIREMENT 2020.pdf
CSA 59 Road Rehab Bid Specifications-Section A - Bid Requirements - 1 of 7~1.pdf
CSA 59 Road Rehab Bid Specifications-Section B - Contract and Bonds - 2 of 7~1.pdf
CSA 59 Road Rehab Bid Specifications-Section C - Prevailing Wage - 3 of 7~1.pdf
CSA 59 Road Rehab Bid Specifications-Section D - General Conditions - 4 of 7~1.pdf
CSA 59 Road Rehab Bid Specifications-Section E - Special Conditions - 5 of 7~1.pdf
CSA 59 Road Rehab Bid Specifications-Section F - Technical Specifications - 6 of 7~1.pdf
CSA 59 Road Rehab Bid Specifications-Section G - Contract Drawings - 7 of 7~1.pdf
CSA 59 Road Rehab Addendum No 1
CSA 59 Road Rehab Addendum No 2
Form Attachments:
Required Quote Attachments
Amendments:
Amendment #
Amendment Date
Amendment Note
1
03/17/2020 10:45:10 AM
Addendum No. 1 changed date of Mandatory Pre-Bid Job Walk to Wednesday, April 8, 2020 and Bid Opening to Thursday, April 23, 2020 per attachment. Attachment File Changes: Header 1. File 'CSA 59 Road Rehab Addendum No 1 ': File 'CSA 59 Road Rehab Addendum No 1 ' added . 2. File 'General Prevailing Wage Determinations': Show Attachment to Vendor Flag changed from "No" to "Yes". 3. File 'Exhibit A PREVAILING WAGE REQUIREMENT 2020.pdf': Show Attachment to Vendor Flag changed from "No" to "Yes".
2
04/02/2020 02:48:57 PM
Header 1. Bid Opening Date changed from "04/02/2020 01:59:59 PM" to "05/14/2020 01:59:59 PM". 2. Pre-Bid Conference changed from "Mandatory Pre-Bid Meeting is scheduled for March 18, 2020 @ 10:00 a.m. at the intersection of Edgecliff Dr and Grass Valley Road in the Lake Arrowhead area where a job woal will follow." to "Mandatory Pre-Bid Meeting is now scheduled for Wednesday, April 29, 2020 @ 10:00 a.m. at the intersection of Edgecliff Dr and Grass Valley Road in the Lake Arrowhead area where a job walk will follow.". Attachment File Changes: Header 1. File 'CSA 59 Road Rehab Addendum No 2 ': File 'CSA 59 Road Rehab Addendum No 2 ' added .
Item Information
Item # 1: ( 913 - 96 )
Provide all labor at State Prevailing Wage Rates, equipment, materials and transportation necessary to satisfactorily perform the work that includes the services to pulverize existing asphalt roadways, shape, grade, compact and pave with compacted hot mix asphalt on approximately 64,400 square feet as shown on the approved plans, specifications and bid documents.
NIGP Code:
913-96
Paving/Resurfacing, Street (Major and Residential)
Qty
Unit Cost
UOM
Total Discount Amt.
Tax Rate
Tax Amount
Total Cost
1.0
SUM - Sum
Manufacturer:
Brand:
Model:
Make:
Packaging:
SBCOUNTY_SBCOUNTY_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status