Bid Solicitation: SPD118-SPDAD-2984
Header Information
Bid Number:
SPD118-SPDAD-2984
Description:
CSA 70, Zone J- Well 5 MCC Enclosure
Bid Opening Date:
07/26/2018 01:59:00 PM
Purchaser:
Michelle Churchill
Organization:
Special Districts
Department:
SPDADMIN - ADMINISTRATION
Location:
ADENG - Engineering
Fiscal Year:
18
Type Code:
RB - Request For Bid
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
05/25/2018
Available Date :
05/25/2018 10:19:00 AM
Info Contact:
gmartin@sdd.sbcounty.gov
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
A Mandatory pre-bid meeting will start at 10am on June 28, 2018 at 12402 Industrial Blvd, STE D-6, Victorville, CA. BIDS SUBMITTED BY FIRMS WHO HAVE NOT ATTENDED THE MANDATORY PRE-BID MEETING WILL BE DISQUALIFIED.
Bulletin Desc:
Construct a block wall enclosure around an existing electrical MCC panel at CSA70J Well 5 Site.
Ship-to Address:
Reception
Eng Tech
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415
US
Email: SDDprocurement@sdd.sbcounty.gov
Phone: (909)386-8800
Bill-to Address:
Special Districts Department
Fiscal Specialist
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415
US
Email: rosa.lopez@sdd.sbcounty.gov
Phone: (909)386-8800
Print Format:
File Attachments:
General Prevailing Wage Determinations.pdf
Exhibit A Prevailing Wage Requirements (2)~1.pdf
General Prevailing Wage Dertermination~1.pdf
Section B Contract Agreement and Bonds~5.pdf
Section C Prevailing Wage Rates~5.pdf
Section D General Conditions~9.pdf
Section E Special Conditions~9.pdf
Section F Technical Specifications~7.pdf
Section G Contract Drawings~4.pdf
Section A Bidding Requirements 6-6-18~1.pdf
Address For Well No.5 Site.jpg
Addendum 1 Extend Bid Date 7-11-18.pdf
Addendum 2 Louver Specifications 7-17-18.pdf
Addendum 3 Door Schedule and Specification 7-17-18.pdf
Addendum 4 Electrical Ground and Footing 7-17-18.pdf
Addendum 5 MCC ENCLOSURE ELECTRICAL 7-17-18.pdf
Addendum 6 Chlorine Room Piping 7-18-18.pdf
Form Attachments:
Required Quote Attachments
Amendments:
Amendment #
Amendment Date
Amendment Note
1
06/13/2018 02:15:38 PM
Correct Scope of Work: Construction of block wall MCC Enclosure, temporary relocation of Chlorine shed and re-installation of chlorine system into new enclosure. This is an Administration change only correcting item description. No response required
2
06/15/2018 10:29:42 AM
Attachment File Changes: Header 1. File 'Address For Well No.5 Site.jpg': File 'Address For Well No.5 Site.jpg' added . Attached Address for Well 5 Site. Administration Admendment only. No Response Required.
3
07/11/2018 09:40:06 AM
Header 1. Bid Opening Date changed from "07/12/2018 01:59:00 PM" to "07/26/2018 01:59:00 PM". 2. Contact Info changed from "" to "gmartin@sdd.sbcounty.gov". Attachment File Changes: Header 1. File 'Addendum 1 Extend Bid Date 7-11-18.pdf': File 'Addendum 1 Extend Bid Date 7-11-18.pdf' added . Extend Well 5 Bid Date to July 26, 2018
4
07/17/2018 03:46:43 PM
Add ADDENDUMS 2 THROUGH ADDENDUM 6. Additional equipment requirements, clarification of items, additional drawings for reference, additional piping, electrical antenna and other items with attachments. Attachment File Changes: Header 1. File 'Addendum 2 Louver Specifications 7-17-18.pdf': File 'Addendum 2 Louver Specifications 7-17-18.pdf' added . 2. File 'Addendum 3 Door Schedule and Specification 7-17-18.pdf': File 'Addendum 3 Door Schedule and Specification 7-17-18.pdf' added . 3. File 'Addendum 4 Electrical Ground and Footing 7-17-18.pdf': File 'Addendum 4 Electrical Ground and Footing 7-17-18.pdf' added . 4. File 'Addendum 5 MCC ENCLOSURE ELECTRICAL 7-17-18.pdf': File 'Addendum 5 MCC ENCLOSURE ELECTRICAL 7-17-18.pdf' added . 5. File 'Addendum 6 Chlorine Room Piping 7-17-18.pdf': File 'Addendum 6 Chlorine Room Piping 7-17-18.pdf' added .
5
07/18/2018 10:48:55 AM
Attachment File Changes: Header 1. File 'Addendum 6 Chlorine Room Piping 7-17-18.pdf': File 'Addendum 6 Chlorine Room Piping 7-17-18.pdf' deleted . 2. File 'Addendum 6 Chlorine Room Piping 7-18-18.pdf': File 'Addendum 6 Chlorine Room Piping 7-18-18.pdf' added . Replace Addendum 6 dated 7-17-18 with revised Addendum 6 dated 7-18-18
Item Information
Item # 1: ( 913 - 60 )
SCOPE OF WORK: CSA 70 Zone CG (Cedar Glen) Cypress Tank Booster Pump Station And Onsite Piping. Successful contractor shall provide all labor, equipment, materials and transportation necessary to satisfactorily perform the work that includes the services to provide and install a Pre-manufactured Booster Station, all on site piping, natural gas generator, retaining block wall and gate.
NIGP Code:
913-60
Construction, Water System/Plants, Main and Service Line
Qty
Unit Cost
UOM
Total Discount Amt.
Tax Rate
Tax Amount
Total Cost
1.0
SUM - Sum
Manufacturer:
Brand:
Model:
Make:
Packaging:
SBCOUNTY_SBCOUNTY_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status