You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: PWG119-SOLID-3069
Header Information
Bid Number:
PWG119-SOLID-3069
Description:
Phase 1B Stage 3 Groundwater Protection System Composite Liner at Victorville Sanitary Landfill
Bid Opening Date:
10/03/2018 09:59:59 AM
Purchaser:
Michelle Churchill
Organization:
Public Works
Department:
SOLIDWASTE - Public Works - Solid Waste
Location:
SWENG - Engineering
Fiscal Year:
19
Type Code:
RB - Request For Bid
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
08/29/2018 09:59:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
A mandatory pre-bid meeting is scheduled for 9:00 a.m., Wednesday, September 12, 2018 at 222 W. Hospitality Ln 2nd Fl, San Bernardino 92415 Conf Rm A. Mandatory job walk following pre-bid mtg.
Bulletin Desc:
Ship-to Address:
Solid Waste Operations Superintendent
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415-0017
US
Email: This_field_not_used@sbcounty.gov
Phone: (909)386-8756
Bill-to Address:
Solid Waste Operations Superintendent
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415-0017
US
Email: This_field_not_used@sbcounty.gov
Phone: (909)386-8756
Print Format:
File Attachments:
General Prevailing Wage Determinations
Exhibit A Prevailing Wage Requirements (2)~1.pdf
Plans For Victorville Phase 1B Stage 3 Liner Part 1 of 9.pdf
Plans For Victorville Phase 1B Stage 3 Liner Part 2 of 9.pdf
Plans For Victorville Phase 1B Stage 3 Liner Part 3 of 9.pdf
Plans For Victorville Phase 1B Stage 3 Liner Part 4 of 9.pdf
Plans For Victorville Phase 1B Stage 3 Liner Part 5 of 9.pdf
Plans For Victorville Phase 1B Stage 3 Liner Part 6 of 9.pdf
Plans For Victorville Phase 1B Stage 3 Liner Part 7 of 9.pdf
Plans For Victorville Phase 1B Stage 3 Liner Part 8 of 9.pdf
Plans For Victorville Phase 1B Stage 3 Liner Part 9 of 9.pdf
Specifications for Victorville Phase 1B Stage 3 Liner _ Part 1 of 2.pdf
Specifications for Victorville Phase 1B Stage 3 Liner _ Part 2 of 2.pdf
Advertisement.docx
Pre-Bid Meeting Sign-in Sheet
Addendum No. 1 to Plans and Bid Docs for Phase 1B State 3 Groundwater Protection - Victorville SL.pdf
Amendment No. 1 To Plans and Bid Documents for the Phase 1B Stage 3 Groundwater Protection System -.pdf
Amendment No 2 to Plans and Bid Documents for the Phase 1B Stage 3 Groundwater Protection VVSL.pdf
Form Attachments:
Required Quote Attachments
Amendments:
Amendment #
Amendment Date
Amendment Note
1
09/24/2018 10:17:11 AM
Attachment File Changes: Header 1. File 'Pre-Bid Meeting Sign-in Sheet': File 'Pre-Bid Meeting Sign-in Sheet' added .
2
09/24/2018 11:54:44 AM
Header 1. Bid Opening Date changed from "09/27/2018 09:59:59 AM" to "10/03/2018 09:59:59 AM". Attachment File Changes: Header 1. File 'Addendum No. 1 to Plans and Bid Docs for Phase 1B State 3 Groundwater Protection - Victorville SL.pdf': File 'Addendum No. 1 to Plans and Bid Docs for Phase 1B State 3 Groundwater Protection - Victorville SL.pdf' added .
3
09/28/2018 02:22:01 PM
Attachment File Changes: Header 1. File 'Amendment No. 1 To Plans and Bid Documents for the Phase 1B Stage 3 Groundwater Protection System -.pdf': File 'Amendment No. 1 To Plans and Bid Documents for the Phase 1B Stage 3 Groundwater Protection System -.pdf' added .
4
10/01/2018 03:54:06 PM
Attachment File Changes: Header 1. File 'Amendment No 2 to Plans and Bid Documents for the Phase 1B Stage 3 Groundwater Protection VVSL.pdf': File 'Amendment No 2 to Plans and Bid Documents for the Phase 1B Stage 3 Groundwater Protection VVSL.pdf' added .
Item Information
Item # 1: ( 912 - 23 )
Project consists if excavation and grading to support the construction of 15 acres of single composite geo-membrane liner, a storm water quality retention basin on the south side of Unit 1, reconfiguration of the site access road, and upgrading the electrical power supply through Southern California Edison to support the leachate pumping system.
NIGP Code:
912-23
Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.)
Qty
Unit Cost
UOM
Total Discount Amt.
Tax Rate
Tax Amount
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
SBCOUNTY_SBCOUNTY_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status