Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: PWG127-LANDD-6586

Header Information

Bid Number: PWG127-LANDD-6586 Description: Randall Avenue Sidewalk Bid Opening Date: 12/03/2026 10:00:59 AM
Purchaser: Michael Reyna Organization: Public Works
Department: LANDDEVCONTRACTS - Public Works - Land Development & Contracts Location: CONTR - Contracts/Inspection
Fiscal Year: 27 Type Code: RB - Request For Bid Allow Electronic Quote: Yes
Alternate Id: H15254  Required Date: Available Date :  10/27/2026 10:00:00 AM
Info Contact: Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: A NON- MANDATORY pre-bid meeting is scheduled for: 10:00 AM, January 24, 2024. To be held via video and teleconference via Teams link in the special provision or Teams Meeting ID: 286 699 975 994 754 and Passcode: bj9aw9dx
Bulletin Desc: Sealed proposals will be received and publicly opened via GoTo at: County Public Works, 825 Third St, SB, CA 92415 in the Contracts Division. Bidders shall complete and attach a fully executed proposal upon submitting their bid. NIGP Class 913 NIGP Class Item 27
Ship-to Address: Ship to
Administrative Services
825 E Third St., Room 201
San Bernardino, CA 92415-0835
US
Email: This_Field_is_Not_Used@sbcounty.gov
Phone: (909) 387-8137
Bill-to Address: Ship to
Administrative Services
825 E Third St., Room 201
San Bernardino, CA 92415-0835
US
Email: This_Field_is_Not_Used@sbcounty.gov
Phone: (909) 387-8137
Print Format:
File Attachments: FINAL SPECS - H15254 - Randall Ave Sidewalk - SIGNED F 1 (002).pdf
FINAL PLANS - H15254 - Randall Ave Sidewalk - SIGNED.pdf
Teams Meeting Info~2.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description

Item Information

Item # 1:   Bidders shall complete and attach a fully executed proposal (P-1 to P-19) upon submitting their bid. Specifically, on pages P-3 and P-4 from the proposal documents, the bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for this purpose. In the case of unit basis items, the amount set forth under the "Total" column shall be the extension of the unit price bid on the basis of the estimated quantity for the item. In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail, however, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, then the amount set forth in the "Total" column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained, rounded to the next lower penny, shall be the unit price.
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
This item is narrative
 
Item # 2:   ( 913  -  27 )   Totalized Line Item Bid Sum (Line Items 1-40) - Contractors shall complete and attach a fully executed proposal (P-1 to P-21) upon submitting their bid. Specifically, on page P-4 and P-5.
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   EA - Each        
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status