You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: PWG126-SOLID-6182
Header Information
Bid Number:
PWG126-SOLID-6182
Description:
Unit 4 Phase 2 Composite Liner Construction Project at the Mid Valley Landfill
Bid Opening Date:
02/10/2026 10:00:59 AM
Purchaser:
Dylan Newton
Organization:
Public Works
Department:
SOLIDWASTE - Public Works - Solid Waste
Location:
SWENG - Engineering
Fiscal Year:
26
Type Code:
RB - Request For Bid
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
12/09/2025 12:00:00 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
A mandatory Pre-Bid Meeting will be held at 10:00AM on January 8, 2026, at the Department of Public Works, Solid Waste Management Division, 222 W. Hospitality Lane, 2nd Floor, San Bernardino, CA 92415-0017.
Bulletin Desc:
A mandatory job walk will follow the pre-bid meeting at the Mid-Valley Landfill, 2390 N. Alder Ave, Rialto, CA 92377. Please bring proper Personal Protection Equipment consisting of safety vest, hard hat and working boots.
Ship-to Address:
Solid Waste Operations Superintendent
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415-0017
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 386-8756
Bill-to Address:
Billing Address
Fiscal Staff
825 East Third Street, Room 201
San Bernardino, CA 92415-0835
US
Email: billpay@dpw.sbcounty.gov
Phone: (909) 387-8137
Print Format:
File Attachments:
Prevailing Wage Feb 2025
Prevailing Wage Feb 2025
Exhibit A Prevailing Wage 2025
Prevailing Wage Feb 2025
MVSL Unit 4 Phase 2 Composite Liner Project- Final Plans
MVSL Unit 4 Phase 2 Composite Liner Construction Project - Full Specifications
Addendum 1 - MVSL U4P2 Liner Construction Project.pdf
Addendum 2 - MVSL U4 P2 Liner Construction Project
Addendum 3 - MVSL U4 P2 Liner Construction Project
Addendum 4- MVSL U4 P2 Liner Construction Project
Bid Results- MVSL U4 P2 Liner Construction Project
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
Amendments:
Amendment #
Amendment Date
Amendment Note
1
01/13/2026 02:53:07 PM
Attachment File Changes: Header 1. File 'Addendum 1 - MVSL U4P2 Liner Construction Project.pdf': File 'Addendum 1 - MVSL U4P2 Liner Construction Project.pdf' added .
2
01/21/2026 04:04:59 PM
Header 1. Bid Opening Date changed from "01/27/2026 10:00:59 AM" to "01/29/2026 10:00:59 AM". Attachment File Changes: Header 1. File 'Addendum 2 - MVSL U4 P2 Liner Construction Project ': File 'Addendum 2 - MVSL U4 P2 Liner Construction Project ' added .
3
01/26/2026 05:03:47 PM
Header 1. Bid Opening Date changed from "01/29/2026 10:00:59 AM" to "02/10/2026 10:00:59 AM". Attachment File Changes: Header 1. File 'Addendum 3 - MVSL U4 P2 Liner Construction Project ': File 'Addendum 3 - MVSL U4 P2 Liner Construction Project ' added .
4
01/29/2026 03:00:18 PM
Attachment File Changes: Header 1. File 'Addendum 4- MVSL U4 P2 Liner Construction Project ': File 'Addendum 4- MVSL U4 P2 Liner Construction Project ' added .
5
02/17/2026 03:19:14 PM
Attachment File Changes: Header 1. File 'Bid Results- MVSL U4 P2 Liner Construction Project ': File 'Bid Results- MVSL U4 P2 Liner Construction Project ' added .
Item Information
Item # 1: ( 912 - 23 )
This project involves the construction of Unit 4 Phase 2 Composite Liner at the Mid-Valley Sanitary Landfill in Rialto, California. The scope of work includes miscellaneous grading, unclassified excavation and fill, installation of composite liner geosynthetics system on slopes and benches, installation of leachate collection system, construction of miscellaneous civil and drainage improvements, installation of landfill gas infrastructure, stormwater management & compliance, improvements of existing road, construction of detention basin, mechanical and electrical improvements on existing LCRS facility. All work shall be completed in accordance with the approved design documents.
NIGP Code:
912-23
Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.)
Qty
Unit Cost
UOM
Total Discount Amt.
Tax Rate
Tax Amount
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Ship-to Address:
Receptionist
Contracts Bldg 6B
825 E Third St.
San Bernardino, CA 92415-0835
Email: This_field_not_used@sbcounty.gov
Phone: (909) 387-7920
Bill-to Address:
Receptionist
Contracts Bldg 6B
825 E Third St.
San Bernardino, CA 92415-0835
Email: This_field_not_used@sbcounty.gov
Phone: (909) 387-7920
Quote #
Description
Date Last Modified
Status