Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: PWG126-FLOOD-6001

Header Information

Bid Number: PWG126-FLOOD-6001 Description: Comprehensive Storm Drain Plan 3-4 and Design of El Rivino Basin and Outlet Storm Drain (Line D) Bid Opening Date: 11/13/2025 03:00:59 PM
Purchaser: Dylan Newton Organization: Public Works
Department: FLOODCONTROL - Public Works - Flood Control Location: FPLAN - Planning
Fiscal Year: 26 Type Code: RP - Request For Proposal Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  10/08/2025 08:00:00 AM
Info Contact: Dustin Michel (909) 387-8124 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: There will be not be a pre-bid conference for this bid however, questions will be due in e-Pro on October 23, 2025 by 3:00 pm.
Bulletin Desc: The District is seeking qualified consultants to prepare Comprehensive Storm Drain Plan Community of Bloomington, City of Fontana, and City of Rialto and to design El Rivino Basin and Outlet Storm Drain (Line D) in the unincorporated Community of Bloomington and City of Rialto.
Ship-to Address: Billing Address
Fiscal Staff
825 E. Third Street, Room 201
San Bernardino, CA 92415-0835
US
Email: billpay@dpw.sbcounty.gov
Phone: (909) 387-8137
Bill-to Address: Billing Address
Fiscal Staff
825 E. Third Street, Room 201
San Bernardino, CA 92415-0835
US
Email: billpay@dpw.sbcounty.gov
Phone: (909) 387-8137
Print Format:
File Attachments: PWG126-FLOOD-6001 - Addendum No. 1.pdf
Exhibit A Prevailing Wage 2025
CSDP 3-4 RFP - Exhibit B.pdf
CSDP 3-4 RFP - Exhibit C.pdf
CSDP 3-4 RFP - Exhibit D.pdf
CSDP 3-4 and Design of El Rivino Basin RFP - PWG 126-FLOOD-6001
Prevailing Wage - September 2025 Packet~1.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Amendments:
Amendment # Amendment Date Amendment Note
1 10/27/2025 04:06:50 PM The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDERS CERTIFICATION FOR THIS ADDENDUM NO. 1 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDERS CERTIFICATION (below) acknowledging receipt of this Addendum No. 1 will NOT be accepted Attachment File Changes: Header 1. File 'PWG126-FLOOD-6001 - Addendum No. 1.pdf': File 'PWG126-FLOOD-6001 - Addendum No. 1.pdf' added .

Item Information

Item # 1:   ( 925  -  36 )   The District is seeking qualified oconsultants to prepare Comprehensive Storm Drain Plan 3-4 in the unincorporated Community of Bloomington, City of Fontana, and City of Rialto and to design El Rivino Basin and Outlet Storm Drain (Line D) in the unincorporated Community of Bloomington and City of Rialto.
NIGP Code: 925-36
   Engineering Services (Not Otherwise Classified)
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   EA - Each        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 925  -  36 )   For Internal Purposes Only
NIGP Code: 925-36
   Engineering Services (Not Otherwise Classified)
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   EA - Each        
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status