Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: PWG126-ADMIN-6299

Header Information

Bid Number: PWG126-ADMIN-6299 Description: Grove Basin Storm Drain Bid Opening Date: 03/19/2026 10:00:59 AM
Purchaser: Dylan Newton Organization: Public Works
Department: LANDDEVCONTRACTS - Public Works - Land Development & Contracts Location: CONTR - Contracts/Inspection
Fiscal Year: 26 Type Code: RB - Request For Bid Allow Electronic Quote: Yes
Alternate Id: F02650  Required Date: Available Date :  02/10/2026 01:37:47 PM
Info Contact: Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: A non-mandatory pre-bid meeting is scheduled for 10:00 A.M., Wednesday, February 25, 2026. To be held via video and teleconference via goto.com/meeting using meeting ID 434-769-549
Bulletin Desc: Sealed proposals will be received and publicly opened via GoTo at: County Public Works, 825 Third St, SB, CA 92415 in the Contracts Division. Bidders shall complete and attach a fully executed proposal upon submitting their bid.
Ship-to Address: Receptionist
Contracts Bldg 6B
825 E Third St.
San Bernardino, CA 92415-0835
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 387-7920
Bill-to Address: Billing Address
Fiscal Staff
825 E. Third Street, Room 201
San Bernardino, CA 92415-0835
US
Email: billpay@dpw.sbcounty.gov
Phone: (909) 387-8137
Print Format:
File Attachments: F02650 - Grove Basin Outlet Storm Drain Plans.pdf
F02650 - Grove Basin Outlet Storm Drain Special Provisions.pdf
Blue Pages Index 2025-2 socal~2.pdf
Addendum No. 1 -F02650 Grove Basin Outlet Storm Drain.pdf
Addendum No. 2 -F02650 Grove Basin Outlet Storm Drain.pdf
Bid Results - Grove Basin Storm Drain F02650.pdf
Revised Bid Results - Grove Basin Storm Drain F02650.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Amendments:
Amendment # Amendment Date Amendment Note
1 03/09/2026 03:57:56 PM The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDER'S CERTIFICATION FOR THIS ADDENDUM NO. 1 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER'S CERTIFICATION (below) acknowledging receipt of this Addendum No. 1 will NOT be accepted. Attachment File Changes: Header 1. File 'Addendum No. 1 -F02650 Grove Basin Outlet Storm Drain.pdf': File 'Addendum No. 1 -F02650 Grove Basin Outlet Storm Drain.pdf' added .
2 03/12/2026 04:52:32 PM The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDER'S CERTIFICATION FOR THIS ADDENDUM NO. 2 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER'S CERTIFICATION (below) acknowledging receipt of this Addendum No. 2 will NOT be accepted. Attachment File Changes: Header 1. File 'Addendum No. 2 -F02650 Grove Basin Outlet Storm Drain.pdf': File 'Addendum No. 2 -F02650 Grove Basin Outlet Storm Drain.pdf' added .
3 03/23/2026 08:07:28 AM THIS IS NOT AN ADDENDUM. This is the bid results. Attachment File Changes: Header 1. File 'Bid Results - Grove Basin Storm Drain F02650.pdf': File 'Bid Results - Grove Basin Storm Drain F02650.pdf' added .
4 04/03/2026 01:56:50 PM THIS IS NOT AN ADDENDUM. This is a revised bid results. Attachment File Changes: Header 1. File 'Revised Bid Results - Grove Basin Storm Drain F02650.pdf': File 'Revised Bid Results - Grove Basin Storm Drain F02650.pdf' added .

Item Information

Item # 1:   Bidders shall complete and attach a fully executed proposal (P-1 to P-21) upon submitting their bid. Specifically, on pages P-4 to P-5 from the proposal documents, the bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for this purpose. In the case of unit basis items, the amount set forth under the "Total" column shall be the extension of the unit price bid on the basis of the estimated quantity for the item. In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail, however, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, then the amount set forth in the "Total" column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained, rounded to the next lower penny, shall be the unit price.
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
This item is narrative
 
Item # 2:   ( 913  -  27 )   Totalized Line Item Bid Sum (Line Items 1-92) - Contractors shall complete and attach a fully executed proposal (P-1 to P-26) upon submitting their bid. Specifically, on page P-4 to P-8.
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   EA - Each        
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status