| Bid Number: |
PWG125-LANDD-5704
|
Description: |
CM RFP - NTH 10 Bridges
|
Bid Opening Date: |
02/28/2025 01:00:59 PM
|
| Purchaser: |
Michael Candelaria
|
Organization: |
Public Works
|
| Department: |
LANDDEVCONTRACTS - Public Works - Land Development & Contracts
|
Location: |
CONTR - Contracts/Inspection
|
| Fiscal Year: |
25
|
Type Code: |
RP - Request For Proposal
|
Allow Electronic Quote: |
Yes
|
| Alternate Id: |
|
Required Date: |
|
Available Date
:
|
01/09/2025 05:17:20 PM |
| Info Contact: |
Melinda Barnes, Contracts - 909-387-7920
|
Bid Type: |
OPEN
|
Informal Bid Flag: |
No
|
| Purchase Method: |
Open Market
|
| Pre Bid Conference: |
A NON- MANDATORY pre-bid meeting is scheduled for: 10:00 AM, February 5, 2025. To be held via video and teleconference via https://global.gotomeeting.com/join/434769549 or (872) 240-3212 using meeting access code 434-769-549.
|
| Bulletin Desc: |
Sealed proposals and separate fee proposals will be received at: County Public Works, 825 Third St, SB, CA 92415 in the Contracts Division or electronic proposals will be accepted via ePro.
|
|
| Ship-to Address: |
Receptionist Contracts Office 825 E Third St., Room 147 San Bernardino, CA 92415-0835 US Email: This_field_not_used@sbcounty.gov Phone: (909) 387-7920
|
Bill-to Address: |
Billing Address Fiscal Staff 825 E. Third Street, Room 201 San Bernardino, CA 92415-0835 US Email: billpay@dpw.sbcounty.gov Phone: (909) 387-8137
|
Print Format: |
|
|
File Attachments:
|
RFP PWG125-LANDD-5704 CM NTH 10 Bridges~2.pdf
Addendum No. 1 - Construction Management for NTH 10 Bridges.pdf
Addendum No. 2 - Construction Management for NTH 10 Bridges.pdf
Addendum No. 3 - Construction Management for NTH 10 Bridges.pdf
100% 10 Bridges Specs.pdf
NTH_at_10 Bridges 100% Plans.pdf
5954(142) FED 5.1.24-AJ EIR.pdf
WDID No 7A363062001_National Trails Highway at 10 Bridges Project_20241127.pdf
EPIMS-SBR-50818-R6_OpLaw.pdf
Atttachment Q - Prevailing Wage 2024-2~1.pdf
Prevailing Wage- Apprentice.pdf
|
|
Form Attachments:
|
|
| Desired Attachment Name |
Description |
|
|
|
Amendments:
|
| Amendment # |
Amendment Date |
Amendment Note |
|
1
|
01/09/2025 05:21:36 PM
|
The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDER'S CERTIFICATION FOR THIS ADDENDUM NO. 1 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER'S CERTIFICATION (below) acknowledging receipt of this Addendum No. 1 will NOT be accepted. Header 1. Bid Opening Date changed from "01/23/2025 04:00:59 PM" to "02/14/2025 01:00:59 PM". 2. Pre-Bid Conference changed from "A NON- MANDATORY pre-bid meeting is scheduled for: 10:00 AM, January 8, 2025. To be held via video and teleconference via https://global.gotomeeting.com/join/434769549 or (872) 240-3212 using meeting access code 434-769-549." to "A NON- MANDATORY pre-bid meeting is scheduled for: 10:00 AM, February 5, 2025. To be held via video and teleconference via https://global.gotomeeting.com/join/434769549 or (872) 240-3212 using meeting access code 434-769-549.". Attachment File Changes: Header 1. File 'Addendum No. 1 - Construction Management for NTH 10 Bridges.pdf': File 'Addendum No. 1 - Construction Management for NTH 10 Bridges.pdf' added .
|
|
2
|
02/05/2025 12:08:20 PM
|
The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDER'S CERTIFICATION FOR THIS ADDENDUM NO. 2 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER'S CERTIFICATION (below) acknowledging receipt of this Addendum No. 2 will NOT be accepted. Header 1. Bid Opening Date changed from "02/14/2025 01:00:59 PM" to "02/28/2025 01:00:59 PM". Attachment File Changes: Header 1. File 'Addendum No. 2 - Construction Management for NTH 10 Bridges.pdf': File 'Addendum No. 2 - Construction Management for NTH 10 Bridges.pdf' added .
|
|
3
|
02/20/2025 03:16:51 PM
|
The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDER'S CERTIFICATION FOR THIS ADDENDUM NO. 3 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER'S CERTIFICATION (below) acknowledging receipt of this Addendum No. 3 will NOT be accepted. Attachment File Changes: Header 1. File 'Addendum No. 3 - Construction Management for NTH 10 Bridges.pdf': File 'Addendum No. 3 - Construction Management for NTH 10 Bridges.pdf' added .
|
|