| Bid Number: |
PWG124-OPERA-5462
|
Description: |
New Building 9
|
Bid Opening Date: |
06/24/2024 03:29:59 PM
|
| Purchaser: |
Michael Candelaria
|
Organization: |
Public Works
|
| Department: |
OPERATIONS - Public Works - Operations
|
Location: |
OPSUP - Operations Support Unit
|
| Fiscal Year: |
24
|
Type Code: |
RB - Request For Bid
|
Allow Electronic Quote: |
Yes
|
| Alternate Id: |
|
Required Date: |
|
Available Date
:
|
06/07/2024 05:59:59 AM |
| Info Contact: |
Angel Lemus @ (909) 855-4968
|
Bid Type: |
OPEN
|
Informal Bid Flag: |
No
|
| Purchase Method: |
Open Market
|
| Pre Bid Conference: |
Once bid has been awarded, a meeting will be held with the award vendor. Last day for questions is Tuesday, June 18th @ 3:30 PM.
|
| Bulletin Desc: |
San Bernardino County Public Works Flood Control is seeking qualified vendors to provide a "MODULAR OFFICE BUILDING" furnished by a successful vendor (s). Specifications are enclosed as "Attachment B".
|
|
| Ship-to Address: |
Secretary Operations 825 E Third St., Room 140 San Bernardino, CA 92415-0835 US Email: This_field_not_used@sbcounty.gov Phone: (909) 387-8039
|
Bill-to Address: |
Billing Address Fiscal Staff 825 E. Third Street, Room 201 San Bernardino, CA 92415-0835 US Email: billpay@dpw.sbcounty.gov Phone: (909) 387-8137
|
Print Format: |
|
|
File Attachments:
|
Exhibit A PREVAILING WAGE REQUIREMENT 2020.pdf
Prevailing Wage Determinations 8-22-2023.pdf
PWG124-OPERA-5462 MODULAR OFFICE BUILDING final.pdf
|
|
Form Attachments:
|
|
| Desired Attachment Name |
Description |
|
|
|
Questions:
|
| Question # |
Print Sequence |
Required |
Question |
Response |
|
1
|
1.0
|
No
|
1.Will this be for a purchase and or rental? This will be a full purchase for the San Bernardino County Flood Control District.
|
|
|
2
|
2.0
|
No
|
2.Will this be a standard pads and piers set or would you like this unit to be a permanent set foundation? Steel frame chassis, above ground supported by leveling jacks. The unit will incorporate steps and an ADA complaint ramp at tone of the entrances.
|
|
|
3
|
3.0
|
No
|
3.There is the term switch gear pointing to the end of the modular, is that where power currently is for tie-in or will a switch gear need to be added? Yes, that is where our current electrical tie in is established from our current modular
|
|
|
4
|
4.0
|
No
|
4.Will foundation plans and permitting be required or is the city exempt/able to handle internally? modulars will be replacing a current modular building no building permits are needed for this parcel. The modulars shall comply with all building codes
|
|
|
5
|
5.0
|
No
|
5.Will the plumbing and electrical hook-ups be performed by the city, or would you like a complete turn-key solution? Final connection of plumbing/electrical and outlets will be installed/wired and connected by County
|
|
|
6
|
6.0
|
No
|
6.Can I perform a site walk to ensure we can put together a compete scope of work? Yes, you can schedule a site visit with me to review the site location.
|
|
|