Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: PWG124-LANDD-5156

Header Information

Bid Number: PWG124-LANDD-5156 Description: Bloomington Ave Bid Opening Date: 11/30/2023 10:00:59 AM
Purchaser: Jason Cloninger Organization: Public Works
Department: LANDDEVCONTRACTS - Public Works - Land Development & Contracts Location: CONTR - Contracts/Inspection
Fiscal Year: 24 Type Code: RB - Request For Bid Allow Electronic Quote: Yes
Alternate Id: TX1795  Required Date: Available Date :  10/17/2023 09:00:00 AM
Info Contact: Melinda Barnes, Contracts - 909-387-7920 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: A NON- MANDATORY pre-bid meeting is scheduled for: 10:00 AM, November 1, 2023. To be held via video and teleconference via https://global.gotomeeting.com/join/434769549 or (872) 240-3212 using meeting access code 434-769-549.
Bulletin Desc: Sealed proposals will be received and publicly opened via GoTo at: County Public Works, 825 Third St, SB, CA 92415 in the Contracts Division. Bidders shall complete and attach a fully executed proposal upon submitting their bid.
Ship-to Address: Receptionist
Contracts Office
825 E Third St., Room 147
San Bernardino, CA 92415-0835
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 387-7920
Bill-to Address: Billing Address
Fiscal Staff
825 E. Third Street, Room 201
San Bernardino, CA 92415-0835
US
Email: billpay@dpw.sbcounty.gov
Phone: (909) 387-8137
Print Format:
File Attachments: GOTO Meeting Info~15.pdf
TX1795 - Bloomington Avenue - X Sections.pdf
ePro (Emerging Small Business Enterprise Program)~1.pdf
TX1795 - Bloomington Avenue Signed Specs~1.pdf
TX1795 - Bloomington Avenue Signed Plans~1.pdf
Draft Bloomington Avenue Road Reconstruction and Drainage Improvement TX1795.pdf
SWPPP Plans (Draft).pdf
Addendum No. 1-Bloomington Ave. TX1795.pdf
Addendum No. 2-Bloomington Ave. TX1795.pdf
Addendum No. 3-Bloomington Ave. TX1795.pdf
Bid Results - Bloomington Ave.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Amendments:
Amendment # Amendment Date Amendment Note
1 11/13/2023 01:30:19 PM The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDER'S CERTIFICATION FOR THIS ADDENDUM NO. 1 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER'S CERTIFICATION (below) acknowledging receipt of this Addendum No. 1 will NOT be accepted. Please make sure you are on the PlanHolder list to be able to bid. You can call 909 387-7920 to verify. Header 1. Bid Opening Date changed from "11/16/2023 10:00:59 AM" to "11/16/2023 03:00:59 PM". Attachment File Changes: Header 1. File 'Addendum No. 1-Bloomington Ave. TX1795.pdf': File 'Addendum No. 1-Bloomington Ave. TX1795.pdf' added .
2 11/16/2023 11:29:14 AM The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDER'S CERTIFICATION FOR THIS ADDENDUM NO. 2 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER'S CERTIFICATION (below) acknowledging receipt of this Addendum No. 2 will NOT be accepted. Header 1. Bid Opening Date changed from "11/16/2023 03:00:59 PM" to "11/30/2023 10:00:59 AM". Attachment File Changes: Header 1. File 'Addendum No. 2-Bloomington Ave. TX1795.pdf': File 'Addendum No. 2-Bloomington Ave. TX1795.pdf' added .
3 11/27/2023 09:52:18 AM The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDER'S CERTIFICATION FOR THIS ADDENDUM NO. 3 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER'S CERTIFICATION (below) acknowledging receipt of this Addendum No. 3 will NOT be accepted. Attachment File Changes: Header 1. File 'Addendum No. 3-Bloomington Ave. TX1795.pdf': File 'Addendum No. 3-Bloomington Ave. TX1795.pdf' added .
4 12/11/2023 01:10:09 PM THIS IS NOT AN ADDENDUM, BID RESULTS ONLY. Attachment File Changes: Header 1. File 'Bid Results - 5th Street and Pedley Road H15189.pdf': File 'Bid Results - 5th Street and Pedley Road H15189.pdf' added .
5 12/11/2023 01:14:31 PM THIS IS NOT AN ADDENDUM, INCORRECT BID RESULTS REPLACED. Attachment File Changes: Header 1. File 'Bid Results - 5th Street and Pedley Road H15189.pdf': File 'Bid Results - 5th Street and Pedley Road H15189.pdf' deleted . 2. File 'Bid Results - Bloomington Ave.pdf': File 'Bid Results - Bloomington Ave.pdf' added .

Item Information

Item # 1:   Bidders shall complete and attach a fully executed proposal (P-1 to P-19) upon submitting their bid. Specifically, on pages P-3 and P-4 from the proposal documents, the bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for this purpose. In the case of unit basis items, the amount set forth under the "Total" column shall be the extension of the unit price bid on the basis of the estimated quantity for the item. In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail, however, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, then the amount set forth in the "Total" column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained, rounded to the next lower penny, shall be the unit price.
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
This item is narrative
 
Item # 2:   ( 913  -  27 )   Totalized Line Item Bid Sum (Line Items 1-52) - Contractors shall complete and attach a fully executed proposal (P-1 to P-19) upon submitting their bid. Specifically, on page P-3 and P-4.
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   SUM - Sum        
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status