| Bid Number: |
PWG123-SOLID-4826
|
Description: |
drilling 18 borings at various depths for sampling; install 3 groundwater wells for monitoring
|
Bid Opening Date: |
01/26/2023 10:00:59 AM
|
| Purchaser: |
Jason Cloninger
|
Organization: |
Public Works
|
| Department: |
SOLIDWASTE - Public Works - Solid Waste
|
Location: |
SWENG - Engineering
|
| Fiscal Year: |
23
|
Type Code: |
RB - Request For Bid
|
Allow Electronic Quote: |
Yes
|
| Alternate Id: |
|
Required Date: |
12/20/2022
|
Available Date
:
|
12/22/2022 07:00:00 AM |
| Info Contact: |
|
Bid Type: |
OPEN
|
Informal Bid Flag: |
No
|
| Purchase Method: |
Open Market
|
| Pre Bid Conference: |
Mandatory pre-bid meeting 10:00am Thursday January 12, 2023 at 222 W. Hospitality Lane, 2nd Floor, San Bernardino, CA 92415. Mandatory job-walk will immediately follow at Mid Valley Landfill.
|
| Bulletin Desc: |
The work includes drilling 18 borings at various depths for soil sampling and installing 3 groundwater wells for monitoring.
|
|
| Ship-to Address: |
Solid Waste Operations Superintendent 222 W. Hospitality Lane 2nd Floor San Bernardino, CA 92415-0017 US Email: This_field_not_used@sbcounty.gov Phone: (909) 386-8756
|
Bill-to Address: |
Billing Address Fiscal Staff 825 East Third Street, Room 201 San Bernardino, CA 92415-0835 US Email: billpay@dpw.sbcounty.gov Phone: (909) 387-8137
|
Print Format: |
|
|
File Attachments:
|
Addendum No 1 MVSL U5 Investigation.pdf
Exhibit A PREVAILING WAGE REQUIREMENT 2020.pdf
Prevailing Wage Determinations FEB 2022
Unit 5 Mid-Valley Pre Development Plans Final.pdf
MVSL Unit 5 Predevelopement Specs FINAL.pdf
|
|
Form Attachments:
|
|
| Desired Attachment Name |
Description |
|
|
|
Amendments:
|
| Amendment # |
Amendment Date |
Amendment Note |
|
1
|
01/19/2023 02:03:05 PM
|
Addendum 1 - attached pre-bid sign in sheets and responded to questions. Attachment File Changes: Header 1. File 'Addendum No 1 MVSL U5 Investigation.pdf': File 'Addendum No 1 MVSL U5 Investigation.pdf' added .
|
|