Bid Solicitation: PWG122-SOLID-4413
Header Information
Bid Number:
PWG122-SOLID-4413
Description:
Phase 1B Liner Construction Project at the Barstow Sanitary Landfill
Bid Opening Date:
01/20/2022 10:00:59 AM
Purchaser:
Jason Cloninger
Organization:
Public Works
Department:
SOLIDWASTE - Public Works - Solid Waste
Location:
SWENG - Engineering
Fiscal Year:
22
Type Code:
RB - Request For Bid
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
12/07/2021 02:24:22 PM
Info Contact:
Johnny Gayman, via Fax at (909) 386-8900, or via email at johnny.gayman@dpw.sbcounty.gov
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Mandatory Pre-Bid meeting is 9:00 a.m., Wednesday, January 5, 2022 at 222 W. Hospitality Lane, 2nd Floor, San Bernardino, CA 92415-0017 in Conference Room A
Bulletin Desc:
A mandatory pre-bid meeting is scheduled for 9:00 a.m., Wednesday, January 5, 2022 at 222 W. Hospitality Lane, 2nd Floor, San Bernardino, CA 92415-0017 in Conference Room A. This meeting is to inform potential contractors and subcontractors of the scope and requirements. A mandatory job walk will immediately follow the pre-bid meeting at the Barstow Sanitary Landfill.
Ship-to Address:
Solid Waste Operations Superintendent
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415-0017
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 386-8756
Bill-to Address:
Billing Address
Fiscal Staff
825 East Third Street, Room 201
San Bernardino, CA 92415-0835
US
Email: billpay@dpw.sbcounty.gov
Phone: (909) 387-8137
Print Format:
File Attachments:
Addendum No 3 BSL Phase 1B.pdf
Addendum No 4 BSL Phase 1B.pdf
Exhibit A PREVAILING WAGE REQUIREMENT 2020.pdf
General Prevailing Wage Determinations 2-22-2020.pdf
BSL Phase 1B Special Provisions.pdf
BSL Phase 1B Liner Project BID Set.pdf
Addendum No 1 BSL Phase 1B.pdf
Addendum No 2 BSL Phase 1B.pdf
Refuse Prism Stability-Barstow Landfill Phase 1B-Groundwater Protection System- Composite Liner Project_May 2021.pdf
2021 BSL JTD Vol I - Final rev.20210315.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
Amendments:
Amendment #
Amendment Date
Amendment Note
1
12/29/2021 09:29:50 AM
Addendum No 2 Attachment File Changes: Header 1. File 'Addendum No 2 BSL Phase 1B.pdf': File 'Addendum No 2 BSL Phase 1B.pdf' added .
2
01/03/2022 02:28:35 PM
GEOTECHNICAL INVESTIGATION REPORT Attachment File Changes: Header 1. File 'Refuse Prism Stability-Barstow Landfill Phase 1B-Groundwater Protection System- Composite Liner Project_May 2021.pdf': File 'Refuse Prism Stability-Barstow Landfill Phase 1B-Groundwater Protection System- Composite Liner Project_May 2021.pdf' added .
3
01/07/2022 08:08:41 AM
2021 BSL JTD Vol I - Final Added Attachment File Changes: Header 1. File '2021 BSL JTD Vol I - Final rev.20210315.pdf': File '2021 BSL JTD Vol I - Final rev.20210315.pdf' added .
4
01/11/2022 02:46:44 PM
Addendum No 3 BSL Phase 1B Attachment File Changes: Header 1. File 'Addendum No 3 BSL Phase 1B.pdf': File 'Addendum No 3 BSL Phase 1B.pdf' added .
5
01/18/2022 08:12:06 AM
Addendum No. 4 Attachment File Changes: Header 1. File 'Addendum No 4 BSL Phase 1B.pdf': File 'Addendum No 4 BSL Phase 1B.pdf' added .
Item Information
Item # 1: ( 912 - 23 )
The work includes earthwork (13.2 acres), screening earthen materials, construction of leachate collection recovery system (HDPE pipe construction), placing and welding geotextile and HDPE geomembrane; construction of drainage improvements, installation of perimeter fencing, tortoise fencing and installation of erosion control measures.
NIGP Code:
912-23
Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.)
Qty
Unit Cost
UOM
Total Discount Amt.
Tax Rate
Tax Amount
Total Cost
1.0
SUM - Sum
Manufacturer:
Brand:
Model:
Make:
Packaging:
Quote #
Description
Date Last Modified
Status