Bid Solicitation: PWG120-SOLID-3460
Header Information
Bid Number:
PWG120-SOLID-3460
Description:
Unit 2 Phases 3-2 and 4 Liner Construction Project at the San Timoteo Sanitary Landfill
Bid Opening Date:
08/26/2019 10:00:59 AM
Purchaser:
Michelle Churchill
Organization:
Public Works
Department:
SOLIDWASTE - Public Works - Solid Waste
Location:
SWENG - Engineering
Fiscal Year:
20
Type Code:
RB - Request For Bid
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
07/22/2019 08:00:59 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
A mandatory pre-bid meeting for prospective bidders will be hel at 10:00 a.m. on Thursday, August 8, 2019. Bids from bidders, not represented at this meeting, will be rejected. A mandatory job walk will immediately follow
Bulletin Desc:
The work includes excavation of up to 2.0 million cubic yards of material, construction of a desilting basin on the northeast side of Unit 2, two engineered stockpiles, 17 acres of composite geo-membrane liner ( and leachate collection system, an electrical service drop and controls to support both the leachate pumping system and the storm water pumping system, stormwater infrastructure, and construction of a new paved haul road.
Ship-to Address:
Solid Waste Operations Superintendent
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415-0017
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 386-8756
Bill-to Address:
Billing Address
Fiscal Staff
825 East Third Street, Room 201
San Bernardino, CA 92415-0835
US
Email: billpay@dpw.sbcounty.gov
Phone: (909) 387-8137
Print Format:
File Attachments:
Exhibit A Prevailing Wage Requirements (2)~1.pdf
General Prevailing Wage Determinations
Final Specs.pdf
MAP - San Timotoe SL.pdf
Plans Part 1.pdf
Plans Part 2.pdf
Plans Part 3.pdf
Plan Holder List.pdf
List of AES Geotechncal Reports - Phase 3-2 and 4.pdf
Report 1 - TM-STSL Phases 3-2 and 4 Slope Stab Dec 2017.pdf
Report 2 - STSL Alt Liner Final TM - Dec 2017.pdf
Report 3 - Response to Review Comments 8-6-18.pdf
Report 4 - Response to Review Comments 11-14-18.pdf
San Timoteo Phs 3-2 and 4 Liner 080719.pdf
San Timoteo Pumps Elect Set 05-09-19.pdf
ADDENDUM NO.1 San Timoteo.pdf
STSL Revised Plan Sheets.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
Amendments:
Amendment #
Amendment Date
Amendment Note
1
08/09/2019 09:47:03 AM
this is the sign in list from the mandatory pre-bid meeting. Attachment File Changes: Header 1. File 'Plan Holder List.pdf': File 'Plan Holder List.pdf' added .
2
08/12/2019 10:34:42 AM
GeoTechnical files for Project Area Attachment File Changes: Header 1. File 'List of AES Geotechncal Reports - Phase 3-2 and 4.pdf': File 'List of AES Geotechncal Reports - Phase 3-2 and 4.pdf' added . 2. File 'Report 1 - TM-STSL Phases 3-2 and 4 Slope Stab Dec 2017.pdf': File 'Report 1 - TM-STSL Phases 3-2 and 4 Slope Stab Dec 2017.pdf' added . 3. File 'Report 2 - STSL Alt Liner Final TM - Dec 2017.pdf': File 'Report 2 - STSL Alt Liner Final TM - Dec 2017.pdf' added . 4. File 'Report 3 - Response to Review Comments 8-6-18.pdf': File 'Report 3 - Response to Review Comments 8-6-18.pdf' added . 5. File 'Report 4 - Response to Review Comments 11-14-18.pdf': File 'Report 4 - Response to Review Comments 11-14-18.pdf' added . 6. File 'San Timoteo Phs 3-2 and 4 Liner 080719.pdf': File 'San Timoteo Phs 3-2 and 4 Liner 080719.pdf' added . 7. File 'San Timoteo Pumps Elect Set 05-09-19.pdf': File 'San Timoteo Pumps Elect Set 05-09-19.pdf' added .
3
08/20/2019 04:06:27 PM
Addendum No. 1 Header 1. Bid Opening Date changed from "08/22/2019 10:00:59 AM" to "08/26/2019 10:00:59 AM". Attachment File Changes: Header 1. File 'ADDENDUM NO.1 San Timoteo.pdf': File 'ADDENDUM NO.1 San Timoteo.pdf' added . 2. File 'STSL Revised Plan Sheets.pdf': File 'STSL Revised Plan Sheets.pdf' added .
Item Information
Item # 1: ( 912 - 23 )
The work includes excavation of up to 2.0 million cubic yards of material, construction of a desilting basin on the northeast side of Unit 2, two engineered stockpiles, 17 acres of composite geo-membrane liner ( and leachate collection system, an electrical service drop and controls to support both the leachate pumping system and the storm water pumping system, stormwater infrastructure, and construction of a new paved haul road.
NIGP Code:
912-23
Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.)
Qty
Unit Cost
UOM
Total Discount Amt.
Tax Rate
Tax Amount
Total Cost
1.0
SUM - Sum
Manufacturer:
Brand:
Model:
Make:
Packaging:
Quote #
Description
Date Last Modified
Status