Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: PWG120-OPERA-3486

Header Information

Bid Number: PWG120-OPERA-3486 Description: Traffic Paint Bid Opening Date: 09/26/2019 02:00:00 PM
Purchaser: Jason Cloninger Organization: Public Works
Department: OPERATIONS - Public Works - Operations Location: OPSUP - Operations Support Unit
Fiscal Year: 20 Type Code: RP - Request For Proposal Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  09/05/2019 08:07:00 AM
Info Contact: Cristina Ruvalcaba 909-387-1882 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: There will not be a pre-bid conference for this project.
Bulletin Desc: The County is seeking qualified vendors to provide traffic paint, furnished in quantities ordered, at times needed by successful Vendor(s).
Ship-to Address: Ship to
Administrative Services
825 E Third St., Room 201
San Bernardino, CA 92415-0835
US
Email: This_Field_is_Not_Used@sbcounty.gov
Phone: (909) 387-8137
Bill-to Address: Billing Address
Fiscal Staff
825 E. Third Street, Room 201
San Bernardino, CA 92415-0835
US
Email: billpay@dpw.sbcounty.gov
Phone: (909) 387-8137
Print Format:
File Attachments: Exhibit A Prevailing Wage Requirements (2)~1.pdf
General Prevailing Wage Determinations
RFP-Traffic Paint_120-OPERA-3486.pdf
RFP-Traffic Paint_120-OPERA-3486-Amended Attachment B.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Amendments:
Amendment # Amendment Date Amendment Note
1 09/05/2019 08:09:17 AM Correcting Bid Opening Date from 8/06/2020 to 9/26/2019. Header 1. Available Date changed from "08/19/2019 08:00:00 AM" to "09/05/2019 08:07:00 AM". Correcting Bid Opening Date 2. Bid Opening Date changed from "08/06/2020 02:00:00 PM" to "09/26/2019 02:00:00 PM". Correcting Bid Opening Date
2 09/11/2019 11:34:16 AM Corrected Quantity on Line 8 and 9 as well as uploaded revised Attachment B, price sheet with quantity corrected for Fast Dry, Waterborne Lead-free, Graffiti Paint. Header 1. Contact Info changed from "" to "Cristina Ruvalcaba 909-387-1882". Added Contact Person Item 8 1. Quantity changed from "100.00000" to "10.0". Corrected Quantity, Line 8 and 9 had quantities transposed. Item 9 1. Quantity changed from "1.00000" to "2.0". Corrected Quantity, Line 8 and 9 had quantities transposed. Attachment File Changes: Header 1. File 'RFP-Traffic Paint_120-OPERA-3486-Amended Attachment B.pdf': File 'RFP-Traffic Paint_120-OPERA-3486-Amended Attachment B.pdf' added . Attached amended/corrected Attachment B. Fast Dry, Waterborne Lead-free, Graffiti Paint quantities corrected.

Item Information

1-5 of 15
1  2  3 
Item # 1:   ( 630  -  66 )   Rapid Dry, High Build Waterborne Traffic Paint-UOM_ 5 Gallon Poly Bucket-Color: White
NIGP Code: 630-66
   Paints, Traffic
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
800.0   BKT - Bucket        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 630  -  66 )   Rapid Dry, High Build Waterborne Traffic Paint-UOM: 5 Gallon Poly Bucket-Color: No Lead Yellow
NIGP Code: 630-66
   Paints, Traffic
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
200.0   BKT - Bucket        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 630  -  66 )   Rapid Dry, High Build Waterborne Traffic Paint- UOM: 250 Gallon Poly Totes-Color: White
NIGP Code: 630-66
   Paints, Traffic
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
160.0   EA - Each        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 630  -  66 )   Rapid Dry, High Build Waterborne Traffic Paint-UOM: 250 Gallon Poly Totes-Color: No Lead Yellow
NIGP Code: 630-66
   Paints, Traffic
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
100.0   EA - Each        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 5:   ( 630  -  66 )   Waterborne Traffic Marking Paint- UOM: 250 Gallon Poly Totes-Color: Black
NIGP Code: 630-66
   Paints, Traffic
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
20.0   EA - Each        
Manufacturer: Brand: Model:
Make: Packaging:
 
1-5 of 15
1  2  3 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status