Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: PWG119-SOLID-3062

Header Information

Bid Number: PWG119-SOLID-3062 Description: Unit 4 Phase3 1 Liner Construction at the Mid Valley Sanitary Landfill Bid Opening Date: 09/17/2018 03:59:59 PM
Purchaser: Michelle Churchill Organization: Public Works
Department: SOLIDWASTE - Public Works - Solid Waste Location: SWENG - Engineering
Fiscal Year: 19 Type Code: RB - Request For Bid Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  08/15/2018 08:00:00 AM
Info Contact: Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: A mandatory pre-bid meeting is scheduled for 9:00 a.m., Wednesday, August 29, 2018 at 222 W. Hospitality Ln 2nd Fl, San Bernardino 92415 Conf Rm A. Mandatory job walk following pre-bid mtg.
Bulletin Desc:
Ship-to Address: Solid Waste Operations Superintendent
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415-0017
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 386-8756
Bill-to Address: Solid Waste Operations Superintendent
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415-0017
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 386-8756
Print Format:
File Attachments: General Prevailing Wage Determinations
Exhibit A Prevailing Wage Requirements (2)~1.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 1 of 15.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 2 of 15.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 3 of 15.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 3 of 15~1.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 4 of 15.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 5 of 15.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 6 of 15.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 6 of 15~1.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 7 of 15.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 8 of 15.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 9 of 15.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 10 of 15.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 11 of 15.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 12 of 15.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 13 of 15.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 14 of 15.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Plans Part 15 of 15.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Specs Part 1 of 2.pdf
ATT-PW-WASTE 8-7-18 Plans and Specifications for MVSL U4P1 Liner Construction - Specs Part 2 of 2.pdf
Addendum No 1 To the Plans and Bid Docs for the Unit 4 Phase 1 Liner Const-Mid Valley Landfill.pdf
Amendment No. 1 to the Plans and Bid Documents for the Unit 4 Phase 1 Linder Construction - Mid Valley Landfill.pdf
Amendment 1 - Plans and Specs-MVLS U4P1 - CORRECTED.pdf
MVSL U4P1 BID RESULTS.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Amendments:
Amendment # Amendment Date Amendment Note
1 09/11/2018 01:13:45 PM Header 1. Bid Opening Date changed from "09/13/2018 03:59:59 PM" to "09/17/2018 03:59:59 PM". Attachment File Changes: Header 1. File 'Addendum No 1 To the Plans and Bid Docs for the Unit 4 Phase 1 Liner Const-Mid Valley Landfill.pdf': File 'Addendum No 1 To the Plans and Bid Docs for the Unit 4 Phase 1 Liner Const-Mid Valley Landfill.pdf' added .
2 09/13/2018 10:29:33 AM Amendment No.1 to the Plans and Bid Documents for the Unit 4 Phase 1 Liner Construction at the Mid Valley Sanitary Landfill
3 09/13/2018 10:50:52 AM Attachment File Changes: Header 1. File 'Amendment No. 1 to the Plans and Bid Documents for the Unit 4 Phase 1 Linder Construction - Mid Valley Landfill.pdf': File 'Amendment No. 1 to the Plans and Bid Documents for the Unit 4 Phase 1 Linder Construction - Mid Valley Landfill.pdf' added .
4 10/26/2018 02:36:37 PM Attachment File Changes: Header 1. File 'Amendment 1 - Plans and Specs-MVLS U4P1 - CORRECTED.pdf': File 'Amendment 1 - Plans and Specs-MVLS U4P1 - CORRECTED.pdf' added . 2. File 'MVSL U4P1 BID RESULTS.pdf': File 'MVSL U4P1 BID RESULTS.pdf' added .

Item Information

Item # 1:   ( 912  -  23 )   The work includes construction of an additional desilting basin on the south side of Unit 4, 14 acres of double composite geo-membrane liner, electrical power to support both the leachate pumping system and the storm water pumping system, and a new electrical service drop near the storm water life station area to obtain additional power supply.
NIGP Code: 912-23
   Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.)
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   EA - Each        
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status