The work includes construction of an additional desilting basin on the south side of Unit 4, 14 acres of double composite geo-membrane liner, electrical power to support both the leachate pumping system and the storm water pumping system, and a new electrical service drop near the storm water life station area to obtain additional power supply.
|
|
|
NIGP Code:
|
912-23
Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.)
|