Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: PWG119-LANDD-3091

Header Information

Bid Number: PWG119-LANDD-3091 Description: Geotechnical for Cherry Ave and Andel Drive Bid Opening Date: 09/14/2018 10:27:00 AM
Purchaser: Michelle Churchill Organization: Public Works
Department: LANDDEVCONTRACTS - Public Works - Land Development & Contracts Location: CONTR - Contracts/Inspection
Fiscal Year: 19 Type Code: Allow Electronic Quote: Yes
Alternate Id:   Required Date: 09/14/2018 Available Date :  09/07/2018 10:27:00 AM
Info Contact: Contact Melinda Barnes at (909)387-7920 Bid Type: OPEN Informal Bid Flag: Yes
Purchase Method: Open Market
Pre Bid Conference:
Bulletin Desc:
Ship-to Address: Receptionist
Contracts Office
825 E Third St., Room 147
San Bernardino, CA 92415-0835
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 387-7920
Bill-to Address: Billing Address
Fiscal Staff
825 E. Third Street, Room 201
San Bernardino, CA 92415-0835
US
Email: billpay@dpw.sbcounty.gov
Phone: (909) 387-8137
Print Format:
File Attachments: General Prevailing Wage Determinations
Exhibit A Prevailing Wage Requirements (2)~1.pdf
Cherry Ave - Andel Dr H14883- Plan Sts - X-secs~1.pdf
Cherry Ave Andel Rd H14883 Spec Book~1.pdf
Addendum No. 1 - Cherry Ave and Andel Dr~1.pdf
Addendum No. 2 - Cherry Ave and Andel Dr~1.pdf
Addendum No. 3 Cherry Ave H14883~1.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description

Item Information

Item # 1:   ( 925  -  46 )   Please submit a cost proposal to provide Asphalt Concrete Compaction Testing and associated services for an upcoming street improvement construction project on Cherry Avenue and Andel Drive, in Fontana area. The construction work, in general, consists of removing existing concrete curb ramp, curb and gutter, spandrel, cross gutter, and sidewalk; pulverize existing asphalt concrete and stockpile; remove existing asphalt concrete dike; place asphalt over cement treated base; placing asphalt concrete dike; placing concrete curb ramp, curb and gutter, spandrel, cross-gutter, and concrete sidewalk, adjust manhole frames and covers, and doing other work appurtenant thereto. The total construction duration is 90 working days. The construction administration and inspection activities will be performed by the County. Each cost proposal should be broken down and itemized into the following components: 1. Attendance at coordination meetings in the field, if requested by the County (assume 8 occurrence) . 2. Coring and testing of Asphalt Concrete (AC) Pavement. 3. Preparation and submittal of the AC Testing Results. 4. Other related services as deemed necessary. The testing for Â?ASPHALT CONCRETEÂ? shall be performed by obtaining three cores (4Â? or 6Â? in diameter) for every 750 tons of AC. For your information, the Contractor is required to prepare and place 500 tons of AC Test Strip first in accordance with the special provisions, for acceptance by the County before the placement of AC on the rest of the project. The overall AC for the project is estimated at 43,000 tons. The type of test to be performed for AC is the Â?California Test 375,Â? known as, Â?IN-PLACE DENSITY AND RELATIVE COMPACTION OF HOT MIX ASPHALT PAVEMENT USING NUCLEAR GAGES.Â? We require your laboratory to perform the Density and Relative Compaction Testing of the in-situ Asphalt Concrete, which is the field test maximum density. If your firm determines that it need to take the samples to its laboratory, then you could do so through Â?Fabricating Test Specimens and Determining Laboratory Test Maximum Density (LTMD).Â?
NIGP Code: 925-46
   Geotechnical Engineering
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   EA - Each        
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status