| Bid Number: |
PWG119-FLOOD-3167
|
Description: |
Donnell Basin Geotechnical- Fault Study
|
Bid Opening Date: |
02/14/2019 04:00:59 PM
|
| Purchaser: |
Michelle Churchill
|
Organization: |
Public Works
|
| Department: |
FLOODCONTROL - Public Works - Flood Control
|
Location: |
FDESG - Design
|
| Fiscal Year: |
19
|
Type Code: |
RP - Request For Proposal
|
Allow Electronic Quote: |
Yes
|
| Alternate Id: |
F01284
|
Required Date: |
|
Available Date
:
|
01/09/2019 04:00:00 PM |
| Info Contact: |
Erwin Fogerson 387-7962
|
Bid Type: |
OPEN
|
Informal Bid Flag: |
No
|
| Purchase Method: |
Open Market
|
| Pre Bid Conference: |
UPDATED CLOSE TIME TO 4:00PM
|
| Bulletin Desc: |
|
|
| Ship-to Address: |
Engineering Tech Flood Control Design 825 E Third St., Room 140 San Bernardino, CA 92415-0835 US Email: This_field_not_used@sbcounty.gov Phone: (909) 387-8101
|
Bill-to Address: |
Engineering Tech Flood Control Design 825 E Third St., Room 140 San Bernardino, CA 92415-0835 US Email: This_field_not_used@sbcounty.gov Phone: (909) 387-8101
|
Print Format: |
|
|
File Attachments:
|
General Prevailing Wage Determinations
Exhibit A Prevailing Wage Requirements (2)~1.pdf
RFP-PWG119-FLOOD-3167 Donnell Basin Fault Activity Study~1.pdf
added Exhibits.pdf
ERRATA No.1 RFP PWG119-FLOOD-3167.pdf
PWG119-Flood-3167 QandA.pdf
PWG119-Flood-3167 QandA Geotechnical Investigation Work Plan for Donnell Basin_12-19-17 (1).pdf
PWG119-FLOOD-3167 QandA Donnell Basin Improvement APE August 5, 2013.pdf
Add QandA
|
|
Form Attachments:
|
|
| Desired Attachment Name |
Description |
|
|
|
Amendments:
|
| Amendment # |
Amendment Date |
Amendment Note |
|
1
|
01/14/2019 11:48:01 AM
|
Attachment File Changes: Header 1. File 'added Exhibits.pdf': File 'added Exhibits.pdf' added . NOT AN AMENDMENT
|
|
2
|
01/24/2019 10:53:58 AM
|
Proposal Deadline has changed to Thursday, February 14, 2019 at 4:00PM Header 1. Bid Opening Date changed from "01/31/2019 04:00:59 PM" to "02/14/2019 04:00:59 AM". 2. Contact Info changed from "" to "Erwin Fogerson 387-7962". Attachment File Changes: Header 1. File 'ERRATA No.1 RFP PWG119-FLOOD-3167.pdf': File 'ERRATA No.1 RFP PWG119-FLOOD-3167.pdf' added .
|
|
3
|
01/28/2019 02:15:58 PM
|
QandA Attachment File Changes: Header 1. File 'PWG119-Flood-3167 QandA.pdf': File 'PWG119-Flood-3167 QandA.pdf' added . 2. File 'PWG119-Flood-3167 QandA Geotechnical Investigation Work Plan for Donnell Basin_12-19-17 (1).pdf': File 'PWG119-Flood-3167 QandA Geotechnical Investigation Work Plan for Donnell Basin_12-19-17 (1).pdf' added . 3. File 'PWG119-FLOOD-3167 QandA Donnell Basin Improvement APE August 5, 2013.pdf': File 'PWG119-FLOOD-3167 QandA Donnell Basin Improvement APE August 5, 2013.pdf' added .
|
|
4
|
01/29/2019 08:33:18 AM
|
Attachment File Changes: Header 1. File 'Add QandA': File 'Add QandA' added .
|
|
5
|
02/14/2019 10:41:01 AM
|
Header 1. Available Date changed from "01/09/2019 01:35:00 PM" to "01/09/2019 04:00:00 PM". 2. Bid Opening Date changed from "02/14/2019 04:00:59 AM" to "02/14/2019 04:00:59 PM". 3. "UPDATED CLOSE TIME TO 4:00PM".
|
|