Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: PWG117-LANDD-2482

Header Information

Bid Number: PWG117-LANDD-2482 Description: Little Mountain Channel Repair Bid Opening Date: 04/10/2017 10:00:59 AM
Purchaser: James Olivas Organization: Public Works
Department: LANDDEVCONTRACTS - Public Works - Land Development & Contracts Location: CONTR - Contracts/Inspection
Fiscal Year: 17 Type Code: RB - Request For Bid Allow Electronic Quote: Yes
Alternate Id: F02639  Required Date: Available Date :  03/28/2017 09:00:00 AM
Info Contact: Melinda Barnes, Contracts - 909-387-7920 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: A Non-mandatory pre-bid meeting is scheduled for: 10:00 AM, April 3, 2017 at 825 East 3rd Street, Rm 147, San Bernardino, California. BIDDER'S ATTENDANCE AT THIS MEETING IS NON-MANDATORY.
Bulletin Desc: Sealed proposals will be received and publicly opened at: County Public Works, 825 Third St, SB, CA 92415 in the Contracts Division. Bidders shall complete and attach a fully executed proposal upon submitting their bid.
Ship-to Address: Receptionist
Contracts Office
825 E Third St., Room 147
San Bernardino, CA 92415-0835
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 387-7920
Bill-to Address: Billing Address
Fiscal Staff
825 E. Third Street, Room 201
San Bernardino, CA 92415-0835
US
Email: billpay@dpw.sbcounty.gov
Phone: (909) 387-8137
Print Format:
File Attachments: General Prevailing Wage Determinations
Exhibit A Prevailing Wage Requirements (2)~1.pdf
Little Mountain Chanl F02639 Spec Book.pdf
Little Mtn Chnl F026398 Plan Shts 0001.pdf
PROPOSAL ~1.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description

Item Information

Item # 1:   Bidders shall complete and attach a fully executed proposal (P-1 to P-14) upon submitting their bid. Specifically on page P-3 from the proposal documents, the bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for this purpose. In the case of unit basis items, the amount set forth under the "Total" column shall be the extension of the unit price bid on the basis of the estimated quantity for the item. In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail, however, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, then the amount set forth in the "Total" column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained, rounded to the next lower penny, shall be the unit price. Effective July 1, 2014, per AB44, a prime contractor will be required to include the license number of a listed subcontractor when submitting a bid on any public work in California. This is in addition to the name and location of the place of business of the subcontractor which is already required by current law.
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
This item is narrative
 
Item # 2:   ( 913  -  27 )   Totalized Line Item Bid Sum (Line Items 1-14) - Contractors shall complete and attach a fully executed proposal (P-1 to P-14) upon submitting their bid. Specifically on page P-3.
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   SUM - Sum        
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status