You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: PWG117-LANDD-2244
Header Information
Bid Number:
PWG117-LANDD-2244
Description:
NTH Dola & Lanzit Ditches
Bid Opening Date:
11/17/2016 10:00:59 AM
Purchaser:
James Olivas
Organization:
Public Works
Department:
LANDDEVCONTRACTS - Public Works - Land Development & Contracts
Location:
CONTR - Contracts/Inspection
Fiscal Year:
17
Type Code:
RB - Request For Bid
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
10/11/2016 10:00:00 AM
Info Contact:
Melinda Barnes, Contracts - 909-387-7920
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
A mandatory pre-bid meeting is scheduled for: 10:00 AM, October 26, 2016 at 825 East 3rd Street, Rm 147, San Bernardino, California. This meeting is to inform bidders of new proposal requirements. BIDDER'S ATTENDANCE AT THIS MEETING IS -MANDATORY.
Bulletin Desc:
Sealed proposals will be received and publicly opened at: County Public Works, 825 Third St, SB, CA 92415 in the Contracts Division. Bidders shall complete and attach a fully executed proposal upon submitting their bid.
Ship-to Address:
Receptionist
Contracts Office
825 E Third St., Room 147
San Bernardino, CA 92415-0835
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 387-7920
Bill-to Address:
Billing Address
Fiscal Staff
825 E. Third Street, Room 201
San Bernardino, CA 92415-0835
US
Email: billpay@dpw.sbcounty.gov
Phone: (909) 387-8137
Print Format:
File Attachments:
General Prevailing Wage Determinations
Nation Trails Hwy Dola Lanzit Brg HF0025 Spec Book.pdf
NTH Dola Lanzit Brdg Plan Shts HF0025-26 0001.pdf
NTH Dola Lanzit Bridge Appendix A HF.pdf
PROPOSAL~6.pdf
Addendum No 1 Dola Lanzit Ditches HF0025 HF0026.pdf
Bid Results NTH Dola and Lanzit Ditch~1.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
Amendments:
Amendment #
Amendment Date
Amendment Note
1
11/08/2016 12:58:42 PM
The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDER'S CERTIFICATION FOR THIS ADDENDUM NO. 1 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER'S CERTIFICATION (below) acknowledging receipt of this Addendum No. 1 will NOT be accepted. Header 1. Bid Opening Date changed from "11/10/2016 10:00:59 AM" to "11/17/2016 10:00:59 AM". The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDER'S CERTIFICATION FOR THIS ADDENDUM NO. 1 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER'S CERTIFICATION (below) acknowledging receipt of this Addendum No. 1 will NOT be accepted. Attachment File Changes: Header 1. File 'Addendum No 1 Dola Lanzit Ditches HF0025 HF0026.pdf': File 'Addendum No 1 Dola Lanzit Ditches HF0025 HF0026.pdf' added . The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDER'S CERTIFICATION FOR THIS ADDENDUM NO. 1 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER'S CERTIFICATION (below) acknowledging receipt of this Addendum No. 1 will NOT be accepted.
2
11/30/2016 11:35:07 AM
THIS IS NOT AN ADDENDUM, BID RESULTS ONLY. Attachment File Changes: Header 1. File 'Bid Results NTH Dola and Lanzit Ditch~1.pdf': File 'Bid Results NTH Dola and Lanzit Ditch~1.pdf' added . THIS IS NOT AN ADDENDUM, BID RESULTS ONLY.
Item Information
Item # 1:
Bidders shall complete and attach a fully executed proposal (P-1 to P-33) upon submitting their bid. Specifically on pages P-4 to P-7 from the proposal documents, the bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for this purpose. In the case of unit basis items, the amount set forth under the "Total" column shall be the extension of the unit price bid on the basis of the estimated quantity for the item. In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail, however, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, then the amount set forth in the "Total" column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained, rounded to the next lower penny, shall be the unit price. Effective July 1, 2014, per AB44, a prime contractor will be required to include the license number of a listed subcontractor when submitting a bid on any public work in California. This is in addition to the name and location of the place of business of the subcontractor which is already required by current law.
Qty
Unit Cost
UOM
Total Discount Amt.
Tax Rate
Tax Amount
Total Cost
This item is narrative
Item # 2: ( 913 - 27 )
Totalized Line Item Bid Sum (Line Items 1-101) - Contractors shall complete and attach a fully executed proposal (P-1 to P-16) upon submitting their bid. Specifically on pages P-4 to P-7.
NIGP Code:
913-27
Construction, Highway and Road
Qty
Unit Cost
UOM
Total Discount Amt.
Tax Rate
Tax Amount
Total Cost
1.0
SUM - Sum
Manufacturer:
Brand:
Model:
Make:
Packaging:
Quote #
Description
Date Last Modified
Status