Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: PWG117-FLOOD-2467

Header Information

Bid Number: PWG117-FLOOD-2467 Description: Geotechnical and Engineering Services for Donnell Basin Bid Opening Date: 05/17/2017 04:00:59 PM
Purchaser: James Olivas Organization: Public Works
Department: FLOODCONTROL - Public Works - Flood Control Location: FDESG - Design
Fiscal Year: 17 Type Code: RP - Request For Proposal Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  04/04/2017 10:00:59 AM
Info Contact: Erwin Fogerson, 387-7962 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: N/A
Bulletin Desc:
Ship-to Address: Engineering Tech
Flood Control Design
825 E Third St., Room 140
San Bernardino, CA 92415-0835
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 387-8101
Bill-to Address: Engineering Tech
Flood Control Design
825 E Third St., Room 140
San Bernardino, CA 92415-0835
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 387-8101
Print Format:
File Attachments: General Prevailing Wage Determinations
Exhibit A Prevailing Wage Requirements (2)~1.pdf
Donnell Basin Geo-Design Services RFP 17-2467.pdf
EXH - D - Donnell Basin Drainage Study.pdf
Addendum No 1-Proposal Submission.pdf
Addendum No 2-Proposal Deadline.pdf
Addendum No. 3-attachements included.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Amendments:
Amendment # Amendment Date Amendment Note
1 04/04/2017 10:10:34 AM Changed opening date to reflect the 04/26/17 @1600. This is what is stated in the RFP. Also added addendum to give instructions on proposal submissions Header 1. Bid Opening Date changed from "04/20/2017 04:00:59 PM" to "04/26/2017 04:00:59 PM". Attachment File Changes: Header 1. File 'Addendum No 1-Proposal Submission.pdf': File 'Addendum No 1-Proposal Submission.pdf' added .
2 04/17/2017 03:55:23 PM 04/1/17 Proposal Submission Deadline changed to 5/17/17 and answer to a question regarding subconsultants. Header 1. Bid Opening Date changed from "04/26/2017 04:00:59 PM" to "05/17/2017 04:00:59 PM". Attachment File Changes: Header 1. File 'Addendum No 2-Proposal Deadline.pdf': File 'Addendum No 2-Proposal Deadline.pdf' added . 04/1/17 Proposal Submission Deadline changed to 5/17/17 and answer to a question regarding subconsultants.
3 05/02/2017 09:14:38 AM Addendum No. 3 adds Exhibit E and answers 3 other questions. Attachment File Changes: Header 1. File 'Addendum No. 3-attachements included.pdf': File 'Addendum No. 3-attachements included.pdf' added . Addendum No. 3 adds Exhibit E and answers 3 other questions.

Item Information

Item # 1:   ( 925  -  46 )   RFP for Geotechnical Investigation and Engineering Design services on Donnell Basin - Geotechnical Investigation and Engineering Design Services - TKE Engineering, Inc. Cost Proposal for PWG117-FLOOD-2467
NIGP Code: 925-46
   Geotechnical Engineering
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   SUM - Sum        
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status