You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: PWG115-OPERA-1239
Header Information
Bid Number:
PWG115-OPERA-1239
Description:
NTH_Guardrail at Park Moabi
Bid Opening Date:
10/22/2014 10:00:59 AM
Purchaser:
Hoa Lam
Organization:
Public Works
Department:
OPERATIONS - Public Works - Operations
Location:
OPSUP - Operations Support Unit
Fiscal Year:
15
Type Code:
RB - Request For Bid
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
10/03/2014 08:00:00 AM
Info Contact:
Hoa Lam, Operations Division- (909) 387-7923
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
N/A
Bulletin Desc:
Sealed proposals will be received and publicly opened at: County Public Works, 825 Third St, SB, CA 92415 in the Contracts Division. Bidders shall complete and attach a fully executed proposal upon submitting their bid.
Ship-to Address:
Engineering Tech
Flood Control Design
825 E Third St., Room 140
San Bernardino, CA 92415-0835
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 387-8101
Bill-to Address:
Billing Address
Fiscal Staff
825 E. Third Street, Room 201
San Bernardino, CA 92415-0835
US
Email: billpay@dpw.sbcounty.gov
Phone: (909) 387-8137
Print Format:
File Attachments:
Park Moabi Guardrail_Special Provisions.pdf
Bid Results NTH Guardrail @ Park Moabi.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
Amendments:
Amendment #
Amendment Date
Amendment Note
1
10/23/2014 10:39:58 AM
THIS IS NOT AN AMENDMENT - BID RESULTS ONLY Attachment Changes: Header 1. File 'Bid Results NTH Guardrail @ Park Moabi.pdf': File 'Bid Results NTH Guardrail @ Park Moabi.pdf' added . THIS IS NOT AN AMENDMENT - BID RESULTS ONLY
Item Information
Item # 1: ( 913 - 27 )
Bidders shall complete and attach a fully executed proposal (P-1 to P-14) upon submitting their bid. Specifically on pages P-3 of the proposal documents, the bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for this purpose. In the case of unit basis items, the amount set forth under the "Total" column shall be the extension of the unit price bid on the basis of the estimated quantity for the item. In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail, however, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, then the amount set forth in the "Total" column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained, rounded to the next lower penny, shall be the unit price. Effective July 1, 2014, per AB44, a prime contractor will be required to include the license number of a listed subcontractor when submitting a bid on any public work in California. This is in addition to the name and location of the place of business of the subcontractor which is already required by current law.
NIGP Code:
913 - 27
Qty
Unit Cost
UOM
Total Discount Amt.
Tax Rate
Tax Amount
Total Cost
This item is narrative
Item # 2: ( 913 - 27 )
Totalized Line Item Bid Sum (Line Items 1-12) - Contractors shall complete and attach a fully executed proposal (P-1 to P-14) upon submitting their bid. Specifically on pages P-3 from the proposal documents.
NIGP Code:
913-27
Construction, Highway and Road
Qty
Unit Cost
UOM
Total Discount Amt.
Tax Rate
Tax Amount
Total Cost
1.0
SUM - Sum
Manufacturer:
Brand:
Model:
Make:
Packaging:
Quote #
Description
Date Last Modified
Status