Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: PWG115-LANDD-1324

Header Information

Bid Number: PWG115-LANDD-1324 Description: Amethyst Basin Coundary Fence Bid Opening Date: 01/29/2015 10:00:59 AM
Purchaser: Melinda Barnes Organization: Public Works
Department: LANDDEVCONTRACTS - Public Works - Land Development & Contracts Location: CONTR - Contracts/Inspection
Fiscal Year: 15 Type Code: RB - Request For Bid Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  12/23/2014 09:00:00 AM
Info Contact: Melinda Barnes, Contacts - 909-387-7920 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: A pre-bid meeting is scheduled for: 10:00 AM, January 7, 2015 at 825 East 3rd Street, Rm 147, San Bernardino, California. This meeting is to inform bidders of new proposal requirements. BIDDER'S ATTENDANCE AT THIS MEETING IS NON-MANDATORY.
Bulletin Desc: Sealed proposals will be received and publicly opened at: County Public Works, 825 Third St, SB, CA 92415 in the Contracts Division. Bidders shall complete and attach a fully executed proposal upon submitting their bid.
Ship-to Address: Receptionist
Contracts Office
825 E Third St., Room 147
San Bernardino, CA 92415-0835
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 387-7920
Bill-to Address: Billing Address
Fiscal Staff
825 E. Third Street, Room 201
San Bernardino, CA 92415-0835
US
Email: billpay@dpw.sbcounty.gov
Phone: (909) 387-8137
Print Format:
File Attachments: Amethyst Basin Bound Fence BID PACKAGE F01336.pdf
Amethyst Basin Bound Fence Plan Set F01336.pdf
AmethystBsnBndFenc-PROP.pdf
ADD No 1 - Amethyst Basin Fence - F01336.pdf
CONTRACTOR Q AND A.pdf
Bid Results - Amethyst Basin Fence F01336.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Amendments:
Amendment # Amendment Date Amendment Note
1 01/08/2015 12:13:11 PM THIS IS NOT AN ADDENDUM. Please submit all questions in writing thur ePro (Q&A tab) and the deadline for all questions is 1/16/15 at 5:00 PM.
2 01/21/2015 09:06:04 AM The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDER'S CERTIFICATION FOR THIS ADDENDUM NO. 1 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER'S CERTIFICATION (below) acknowledging receipt of this Addendum No. 1 will NOT be accepted. Header 1. Bid Opening Date changed from "01/22/2015 10:00:59 AM" to "01/29/2015 10:00:59 AM". The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDER'S CERTIFICATION FOR THIS ADDENDUM NO. 1 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER'S CERTIFICATION (below) acknowledging receipt of this Addendum No. 1 will NOT be accepted. Attachment Changes: Header 1. File 'ADD No 1 - Amethyst Basin Fence - F01336.pdf': File 'ADD No 1 - Amethyst Basin Fence - F01336.pdf' added . The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDER'S CERTIFICATION FOR THIS ADDENDUM NO. 1 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER'S CERTIFICATION (below) acknowledging receipt of this Addendum No. 1 will NOT be accepted.
3 01/26/2015 09:10:00 AM THIS IS NOT AN AMENDMENT - ATTACHED ARE THE QUESTIONS AND ANSWERS FOR AMETHYST BASIN. Attachment Changes: Header 1. File 'CONTRACTOR Q AND A.pdf': File 'CONTRACTOR Q AND A.pdf' added . THIS IS NOT AN AMENDMENT - ATTACHED ARE THE QUESTIONS AND ANSWERS FOR AMETHYST BASIN.
4 02/04/2015 12:44:04 PM THIS IS NOT AN ADDENDUM, THIS IS FOR BID RESULTS ONLY Attachment Changes: Header 1. File 'Bid Results - Amethyst Basin Fence F01336.pdf': File 'Bid Results - Amethyst Basin Fence F01336.pdf' added . THIS IS NOT AN ADDENDUM, THIS IS FOR BID RESULTS ONLY

Item Information

Item # 1:   Bidders shall complete and attach a fully executed proposal (P-1 to P-14) upon submitting their bid. Specifically on P-3 from the proposal documents, the bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for this purpose. In the case of unit basis items, the amount set forth under the "Total" column shall be the extension of the unit price bid on the basis of the estimated quantity for the item. In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail, however, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, then the amount set forth in the "Total" column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained, rounded to the next lower penny, shall be the unit price. Effective July 1, 2014, per AB44, a prime contractor will be required to include the license number of a listed subcontractor when submitting a bid on any public work in California. This is in addition to the name and location of the place of business of the subcontractor which is already required by current law.
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
This item is narrative
 
Item # 2:   ( 913  -  27 )   Totalized Line Item Bid Sum (Line Items 1-14) - Contractors shall complete and attach a fully executed proposal (P-1 to P-14) upon submitting their bid. Specifically on page P-3 from the proposal documents.
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   SUM - Sum        
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status