| Bid Number: |
PWG115-FLOOD-1492
|
Description: |
RFP Warm Creeks Basins
|
Bid Opening Date: |
06/10/2015 04:00:59 PM
|
| Purchaser: |
Diana Diaz
|
Organization: |
Public Works
|
| Department: |
FLOODCONTROL - Public Works - Flood Control
|
Location: |
FDESG - Design
|
| Fiscal Year: |
15
|
Type Code: |
RP - Request For Proposal
|
Allow Electronic Quote: |
Yes
|
| Alternate Id: |
W.O. F02249
|
Required Date: |
|
Available Date
:
|
05/05/2015 08:00:00 AM |
| Info Contact: |
efogerson@dpw.sbcounty.gov
|
Bid Type: |
OPEN
|
Informal Bid Flag: |
No
|
| Purchase Method: |
Open Market
|
| Pre Bid Conference: |
N/A
|
| Bulletin Desc: |
The District wishes to perform a site-specific geotechnical, geologic, and geophysical investigation for District owned properties in and around the area of Warm Creek Basins in the City of San Bernardino, CA. The approximately 94 acre site is bounded by Warm Creek Channel to the west and northwest, I-215 Freeway to the northeast, Auto Plaza Drive to the east and Fairway Drive to the south. A map of the site is included in Exhibit B.
|
|
| Ship-to Address: |
Engineering Tech Flood Control Design 825 E Third St., Room 140 San Bernardino, CA 92415-0835 US Email: This_field_not_used@sbcounty.gov Phone: (909) 387-8101
|
Bill-to Address: |
Billing Address Fiscal Staff 825 E. Third Street, Room 201 San Bernardino, CA 92415-0835 US Email: billpay@dpw.sbcounty.gov Phone: (909) 387-8137
|
Print Format: |
|
|
File Attachments:
|
General Prevailing Wage Determinations.pdf
RFP Warm Creek Basins Geotechnical-final.pdf
Addendum No. 1~3.pdf
Exhibit-D-Right-of-Way Map.pdf
Exhibit-E-As-Built Plan-Lytle Warm Creek Channel from I-10 to I-215.pdf
Exhibit F-As-Built Plan-Lytle Warm Creek Channel form East Twin Creek Channel to I-215.pdf
Exhibit-G-Concept Grading Plan for Warm Creek Basins-Cover Sheet.pdf
Exhibit H-Concept Grading Plan for Warm Creek Basins-Basin No. 2 Plan.pdf
Exhibit I-Concept Grading Plan for Warm Creek Basins-Basin No. 3 Plan.pdf
Exhibit J-Concept Grading Plan for Warm Creek Basins-Basin No. 4 Plan.pdf
Exhibit K-US Army Corps of Engineers Supplemental Design Memorandum for Lytle and Warm Creeks.pdf
Exhibit L - Warm Creek Basins existing topographical map.pdf
|
|
Form Attachments:
|
|
| Desired Attachment Name |
Description |
|
|
|
Amendments:
|
| Amendment # |
Amendment Date |
Amendment Note |
|
1
|
05/27/2015 10:04:41 AM
|
Please note the change in the deadline for submittal date to 6/10/15 at 4:00 PM. There will NOT be a Pre-Bid Conference. Header 1. Bid Opening Date changed from "06/04/2015 05:00:01 PM" to "06/10/2015 04:00:59 PM". 2. Pre-Bid Conference changed from "" to "N/A". Attachment File Changes: Header 1. File 'Addendum No. 1~3.pdf': File 'Addendum No. 1~3.pdf' added . 2. File 'Exhibit-D-Right-of-Way Map.pdf': File 'Exhibit-D-Right-of-Way Map.pdf' added . 3. File 'Exhibit-E-As-Built Plan-Lytle Warm Creek Channel from I-10 to I-215.pdf': File 'Exhibit-E-As-Built Plan-Lytle Warm Creek Channel from I-10 to I-215.pdf' added . 4. File 'Exhibit F-As-Built Plan-Lytle Warm Creek Channel form East Twin Creek Channel to I-215.pdf': File 'Exhibit F-As-Built Plan-Lytle Warm Creek Channel form East Twin Creek Channel to I-215.pdf' added . 5. File 'Exhibit-G-Concept Grading Plan for Warm Creek Basins-Cover Sheet.pdf': File 'Exhibit-G-Concept Grading Plan for Warm Creek Basins-Cover Sheet.pdf' added . 6. File 'Exhibit H-Concept Grading Plan for Warm Creek Basins-Basin No. 2 Plan.pdf': File 'Exhibit H-Concept Grading Plan for Warm Creek Basins-Basin No. 2 Plan.pdf' added . 7. File 'Exhibit I-Concept Grading Plan for Warm Creek Basins-Basin No. 3 Plan.pdf': File 'Exhibit I-Concept Grading Plan for Warm Creek Basins-Basin No. 3 Plan.pdf' added . 8. File 'Exhibit J-Concept Grading Plan for Warm Creek Basins-Basin No. 4 Plan.pdf': File 'Exhibit J-Concept Grading Plan for Warm Creek Basins-Basin No. 4 Plan.pdf' added . 9. File 'Exhibit K-US Army Corps of Engineers Supplemental Design Memorandum for Lytle and Warm Creeks.pdf': File 'Exhibit K-US Army Corps of Engineers Supplemental Design Memorandum for Lytle and Warm Creeks.pdf' added . 10. File 'Exhibit L - Warm Creek Basins existing topographical map.pdf': File 'Exhibit L - Warm Creek Basins existing topographical map.pdf' added .
|
|
2
|
05/27/2015 10:36:59 AM
|
THIS IS NOT A ADDENDUM, THIS IS A STATEMENT REGARDING ADDENDUM NO. 1 - The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDER'S CERTIFICATION FOR THIS ADDENDUM NO. 1 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER'S CERTIFICATION (below) acknowledging receipt of this Addendum No. 1 will NOT be accepted.
|
|