You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: PWG113-SOLID-0565
Header Information
Bid Number:
PWG113-SOLID-0565
Description:
Landfill Gas Collection & Control System - Big Bear Sanitary Landfill
Bid Opening Date:
07/29/2013 04:00:00 PM
Purchaser:
JoAnne Sardegna
Organization:
Public Works
Department:
SOLIDWASTE - Public Works - Solid Waste
Location:
SWENG - Engineering
Fiscal Year:
13
Type Code:
Allow Electronic Quote:
Yes
Alternate Id:
Proj #41300110
Required Date:
Available Date :
06/26/2013 08:00:00 AM
Info Contact:
Darren Meeka (909) 386-9017 or darren.meeka@dpw.sbcounty.gov
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
MANDATORY pre-bid meeting is scheduled for Monday, July 8, 2013 @ 9:00 a.m. at 222 W. Hospitality Ln., 2nd Floor, San Bernardino. A mandatory job walk will immediately follow the pre-bid meeting at the Big Bear Sanitary Landfill.
Bulletin Desc:
Installation of 67 landfill gas wells, associated below grade header and lateral lines, and a 2,500 gallon condensate tank.
Ship-to Address:
Solid Waste Operations Superintendent
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415-0017
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 386-8756
Bill-to Address:
Solid Waste Operations Superintendent
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415-0017
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 386-8756
Print Format:
File Attachments:
Contract Transaction Charge (CTC).pdf
RFB-Bid Template-Product.doc
Bid Docs Big Bear LFGCCS.pdf
PLANS LFGCCS Big Bear Landfill.pdf
Addendum 1 - Plans & Specs BB LFG Construction_7-16-13.pdf
As-Built_Big Bear Closure Const. Field Changes-Redline_FINAL_8-2-11.pdf
Bid Schedule_LFGCCS at the BBSL_ADD.No.1_7-16-13.pdf
SEC 1B - Basis of Payment_ADD.No.1.pdf
SEC 1C - Special Instructions_ADD.No.1.pdf
SEC 1G - Shop Drawings Product Data Samples and As-BuiltsADD.No.1.pdf
SEC 1I - Temporary Facilities and Controls_ADD.No.1.pdf
SEC 1K - Field Offices and Sheds_ADD.No.1.pdf
SEC 3D - Excavating Backfill and Compaction for LFG Systems_ADD.No.1.pdf
SWPPP 2012-Big Bear SWPPP.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
Amendments:
Amendment #
Amendment Date
Amendment Note
1
07/16/2013 04:10:23 PM
PLEASE NOTE: BID DUE DATE HAS CHANGED. BIDS ARE NOW DUE ON MONDAY, JULY 29, 2013 AT 4:00 P.M. Header 1. Bid Opening Date changed from "07/22/2013 04:00:00 PM" to "07/29/2013 04:00:00 PM". Attachment Changes: Header 1. File 'Addendum 1 - Plans & Specs BB LFG Construction_7-16-13.pdf': File 'Addendum 1 - Plans & Specs BB LFG Construction_7-16-13.pdf' added . 2. File 'As-Built_Big Bear Closure Const. Field Changes-Redline_FINAL_8-2-11.pdf': File 'As-Built_Big Bear Closure Const. Field Changes-Redline_FINAL_8-2-11.pdf' added . 3. File 'Bid Schedule_LFGCCS at the BBSL_ADD.No.1_7-16-13.pdf': File 'Bid Schedule_LFGCCS at the BBSL_ADD.No.1_7-16-13.pdf' added . 4. File 'SEC 1B - Basis of Payment_ADD.No.1.pdf': File 'SEC 1B - Basis of Payment_ADD.No.1.pdf' added . 5. File 'SEC 1C - Special Instructions_ADD.No.1.pdf': File 'SEC 1C - Special Instructions_ADD.No.1.pdf' added . 6. File 'SEC 1G - Shop Drawings Product Data Samples and As-BuiltsADD.No.1.pdf': File 'SEC 1G - Shop Drawings Product Data Samples and As-BuiltsADD.No.1.pdf' added . 7. File 'SEC 1I - Temporary Facilities and Controls_ADD.No.1.pdf': File 'SEC 1I - Temporary Facilities and Controls_ADD.No.1.pdf' added . 8. File 'SEC 1K - Field Offices and Sheds_ADD.No.1.pdf': File 'SEC 1K - Field Offices and Sheds_ADD.No.1.pdf' added . 9. File 'SEC 3D - Excavating Backfill and Compaction for LFG Systems_ADD.No.1.pdf': File 'SEC 3D - Excavating Backfill and Compaction for LFG Systems_ADD.No.1.pdf' added . 10. File 'SWPPP 2012-Big Bear SWPPP.pdf': File 'SWPPP 2012-Big Bear SWPPP.pdf' added .
Item Information
Item # 1: ( 913 - 56 )
Installation of 67 landfill gas wells, associated below grade header and lateral lines, and a 2,500 gal condensate tank at the Big Bear Sanitary Landfill
NIGP Code:
913-56
Construction, Utility/Underground Projects
Qty
Unit Cost
UOM
Total Discount Amt.
Tax Rate
Tax Amount
Total Cost
1.0
$1,702,534.00
EA - Each
$0.00
$0.00
$1,702,534.00
Manufacturer:
Brand:
Model:
Make:
Packaging:
Quote #
Description
Date Last Modified
Status