Bid Solicitation: PWG113-LANDD-0095

Header Information

Bid Number: PWG113-LANDD-0095 Description: Cherry Avenue Widening - Phase 2, H13630, H14501 Bid Opening Date: 08/16/2012 10:00:00 AM
Purchaser: Tawni Norberg Organization: Public Works
Department: LANDDEVCONTRACTS - Public Works - Land Development & Contracts Location: CONTR - Contracts/Inspection
Fiscal Year: 13 Type Code: Allow Electronic Quote: Yes
Alternate Id: H13630, H14501  Required Date: Available Date :  07/17/2012 08:00:00 AM
Info Contact: Tawni Norberg, Contacts Plans and Specs Provider - 909-387-7920 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: A mandatory pre-bid meeting is scheduled for: 10:00 AM, August 8, 2012 at 825 East 3rd Street, Rm 147, San Bernardino, California. This is to inform bidders of new proposal & ESBE requirements. BIDDER'S ATTENDANCE AT THIS MEETING IS MANDATORY.
Bulletin Desc: Sealed proposals will be received and publicly opened at 10:00 AM, August 16, 2012 at: County Public Works, 825 3rd St, SB, CA 92415 in the Contracts Division. Bidders shall complete and attach a fully executed proposal upon submitting their bid.
Ship-to Address: Receptionist
Contracts Office
825 E Third St., Room 147
San Bernardino, CA 92415-0835
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 387-7920
Bill-to Address: Receptionist
Contracts Office
825 E Third St., Room 147
San Bernardino, CA 92415-0835
US
Email: This_field_not_used@sbcounty.gov
Phone: (909) 387-7920
Print Format:
File Attachments: Cherry Avenue Widening- Phase II - Plan set
Cherry Avenue Widening- Phase II - Cross Sections
Cherry Avenue Widening- Phase II - SWPPP
Location MAp~3.pdf
Ccherry Avenue Widening - Phase II - Special Provisions
Cherry Avenue Widening - Phase II - Proposal
Cherry Ave Phz II (SWPPP) - revised.pdf
Complete Addendum No. 1.pdf
Bid Results Cherry Avenue Widening Phase II.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Amendments:
Amendment # Amendment Date Amendment Note
1 08/09/2012 02:16:55 PM Item 2 1. Unit Cost changed from "4031121.40000" to "4124991.4". 2. Description changed from "CHERRY AVE WIDENING - Totalized Line Item Bid Sum (Line Items 1-74) Contractor to upload and attach completed itemized bid Proposal sheets as found in the Bid Proposal Package (P-3 to P-6)" to "CHERRY AVE WIDENING - Totalized Line Item Bid Sum (Line Items 1-75) Contractor to upload and attach completed itemized bid Proposal sheets as found in the Bid Proposal Package (Addendum 1, P-3 to Addendum 1, P-6)". Item 3 1. Unit Cost changed from "44964.00000" to "45759.0". 2. Description changed from "RIGHT TURN LANE - Cherry at Foothill - Totalized Line Item Bid Sum (Line Items 75-107) Contractor to upload and attach completed itemized bid Proposal sheets as found in Proposal Package (P-3 to P-6)" to "RIGHT TURN LANE - Cherry at Foothill - Totalized Line Item Bid Sum (Line Items 76-108) Contractor to upload and attach completed itemized bid Proposal sheets as found in Proposal Package (Addendum 1, P-3 to Addendum 1, P-6)". Attachment Changes: Header 1. File 'Cherry Ave Phz II (SWPPP) - revised.pdf': File 'Cherry Ave Phz II (SWPPP) - revised.pdf' added . 2. File 'Complete Addendum No. 1.pdf': File 'Complete Addendum No. 1.pdf' added .
2 08/20/2012 12:17:00 PM Attachment Changes: Header 1. File 'Bid Results Cherry Avenue Widening Phase II.pdf': File 'Bid Results Cherry Avenue Widening Phase II.pdf' added .

Item Information

Item # 1:   Bidders shall complete and attach a fully executed proposal (P-1 to P-18) upon submitting their bid. Specifically on page P-3 to P-6 from the proposal documents, the bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for this purpose. In the case of unit basis items, the amount set forth under the "Total" column shall be the extension of the unit price bid on the basis of the estimated quantity for the item. In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail, however, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, then the amount set forth in the "Total" column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained, rounded to the next lower penny, shall be the unit price.
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
This item is narrative
 
Item # 2:   ( 913  -  27 )   CHERRY AVE WIDENING - Totalized Line Item Bid Sum (Line Items 1-75) Contractor to upload and attach completed itemized bid Proposal sheets as found in the Bid Proposal Package (Addendum 1, P-3 to Addendum 1, P-6)
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0 $4,124,991.40 SUM - Sum $0.00 $0.00 $4,124,991.40
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 913  -  27 )   RIGHT TURN LANE - Cherry at Foothill - Totalized Line Item Bid Sum (Line Items 76-108) Contractor to upload and attach completed itemized bid Proposal sheets as found in Proposal Package (Addendum 1, P-3 to Addendum 1, P-6)
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0 $45,759.00 SUM - Sum $0.00 $0.00 $45,759.00