Logo

Bid Tabulation for Bid #PWG117-LANDD-2525
San Bernardino County - Bid Tabulation for Bid #PWG117-LANDD-2525

Bid Tabulation for Bid #PWG117-LANDD-2525

Quotes Items Header Questions Subcontractors Score Summary       Back to Bid
                           
Total Item Count: 2 Total Awardable Quote Count:  4  Bid Status:  2BPO - Bid to PO (When a Bid is turned into a PO) 


Cancel Item info/Quote info (00000848)William Kanayan Construction
<Quote: 00011399>
(00002730)Trinity Construction
<Quote: 00011359>
(00008211)Braughton Construction Inc.
<Quote: 00011358>
(00002097)Jergensen Construction
<Quote: 00011360>
Bidders shall complete and attach a fully executed proposal (P-1 to P-17) upon submitting their bid. Specifically on pag...
Item #:1    Print Sequence:1.0    Status:2BO - Opened
(Narrative Item)
       
Totalized Line Item Bid Sum (Line Items 1-11) - Contractors shall complete and attach a fully executed proposal (P-1 to ...
Item #:2    Print Sequence:2.0    Status:2BPO - Bid to PO
Quantity:1.0    Uom:SUM

Unit Cost $63,500.00
Tax Rate 0.0%
Lowest Item Price

Award




Unit Cost $111,564.91
Tax Rate 0.0%

Award




Unit Cost $150,010.00
Tax Rate 0.0%

Award




Unit Cost $220,000.00
Tax Rate 0.0%

Award



Totals:  $Vendor Gross Total:
$ Vendor Net Total:
$ Evaluation Total:
$ Awarded:
$63,500.00
$63,500.00
 $63,500.00
$63,500.00
$111,564.91
$111,564.91
 $111,564.91
$0.00
$150,010.00
$150,010.00
 $150,010.00
$0.00
$220,000.00
$220,000.00
 $220,000.00
$0.00
Eval Codes:
Pref Codes:
Evaluation Code Descriptions:
Lowest Item Price or Lowest Evaluation Quote Total = Lowest Item Price or Lowest Evaluation Quote Total
   
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.