Logo

Bid Tabulation for Bid #PWG116-LANDD-1835
San Bernardino County - Bid Tabulation for Bid #PWG116-LANDD-1835

Bid Tabulation for Bid #PWG116-LANDD-1835

Quotes Items Header Questions Subcontractors Score Summary       Back to Bid
                           
Total Item Count: 2 Total Awardable Quote Count:  8  Bid Status:  2BPO - Bid to PO (When a Bid is turned into a PO) 
Quote
Index:
1-5 of 8
1  2 


Cancel Item info/Quote info (00005335)Three Peaks Corp.
<Quote: 00007805>
(00000848)William Kanayan Construction
<Quote: 00007811>
(00009013)Southwest General Engineering, Inc.
<Quote: 00007804>
(00008122)Mamco, Inc. dba Alabbasi
<Quote: 00007806>
(00005065)Jeremy Harris Construction
<Quote: 00007807>
Bidders shall complete and attach a fully executed proposal (P-1 to P-15) upon submitting their bid. Specifically on P-4...
Item #:1    Print Sequence:1.0    Status:2BO - Opened
(Narrative Item)
         
Totalized Line Item Bid Sum (Line Items 1-20) - Contractors shall complete and attach a fully executed proposal (P-1 to ...
Item #:2    Print Sequence:2.0    Status:2BPO - Bid to PO
Quantity:1.0    Uom:SUM

Unit Cost $69,480.00
Tax Rate 0.0%
Lowest Item Price

Award




Unit Cost $75,555.00
Tax Rate 0.0%

Award




Unit Cost $86,000.00
Tax Rate 0.0%

Award




Unit Cost $97,777.00
Tax Rate 0.0%

Award




Unit Cost $99,600.00
Tax Rate 0.0%

Award



Totals:  $Vendor Gross Total:
$ Vendor Net Total:
$ Evaluation Total:
$ Awarded:
$69,480.00
$69,480.00
 $69,480.00
$69,480.00
$75,555.00
$75,555.00
 $75,555.00
$0.00
$86,000.00
$86,000.00
 $86,000.00
$0.00
$97,777.00
$97,777.00
 $97,777.00
$0.00
$99,600.00
$99,600.00
 $99,600.00
$0.00
Eval Codes:
Pref Codes:
Evaluation Code Descriptions:
Lowest Item Price or Lowest Evaluation Quote Total = Lowest Item Price or Lowest Evaluation Quote Total
   
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.